In the following, the recording of a measured value-based preventive activity is explained:
A filter sieve is to be checked when 400 liters are removed and when 50 liters remain. An object monitoring line for consumption measurement already exists at the technical object. A second object monitoring line is to be created for linking with a time schedule.
- First, it must be navigated to the Technical Object (Compressor).
- An object monitoring line is added and
- First the template code is selected,
- Then, the associated Filter Sieve Inspection Time Schedule for the Compressor is assigned.
By opening the Card view of the object monitoring line (clicking on “Process”, then “Card”), it is possible to define in the „Attrition/Consumption“ info tab:
- „Initial Value“, i.e. setpoint or 100%-value of the attrition/consumption to be measured,
- „Interval“, at which attrition/consumption interval the Inspection should be due,
- „Critical Value“, at which the appointment should be due when the value entered here is reached (the larger the value, the earlier the appointment will be displayed as "due"),
- „Tolerance“, deviation (positive and negative) to the „Interval“ and „Critical Value“.
When the card view is closed, the object monitoring line is recorded and the maintenance date will be automatically displayed in the role center when the next due date is reached considering the tolerance value.
Comments
0 comments
Article is closed for comments.