With Item Feedback, items can be posted directly to a work order without having to be assigned to the mobile user's resource. The material is withdrawn directly via the "Work Order Journal Line" in MAIN-TOOL.
In the "Work Order No." field, a work order must be selected (via entry, search or barcode function) that is "In Progress" or "Execution".
The removal of an "Item No." from a "Location" and, if applicable, a "Bin" can then be saved with a "Quantity".
The field can be edited using the pencil symbol or, where available, by barcode scan.
After the Item Feedback has been saved, it can be changed or deleted until synchronization by clicking on the menu button in the "Already added" menu.
Comments
0 comments
Article is closed for comments.