Basic Description of the General Procedure
Opening a Checklist Tasks
For the creation of a checklist so called checklist tasks must be created in the checklist tasks list first.
With search for „Checklist Tasks” the list can be opened:
Creating a Checklist Task
With click on „New“ a new list element is created:
Entry of a Checklist Task
The column headings of a checklist task line are:
Field Name | Description / Information |
No. | Is filled automatically following to Number Series when leaving the field. |
Text | Text entry of the checklist task line (max. 80 characters). If a feedback is expected, it is recommended, to formulate a question. |
Data Type |
Only relevant at Checklist Tasks, that expect a feedback: Definition, of which “Data Type” the expected feedback is. The options are:
|
Range of Values Code |
Only relevant for checklist tasks, that expect a feedback from a fixed range of values: Selection “Range of Values Code”, that defines, which values can be responded. |
Monitoring Template Code |
Only relevant for checklist tasks, that expect a feedback to a Monitoring Template: Selection „Monitoring Template Code“, to which a value is to be responded. |
Range of Value Setup
To define a Range of Values, i.e. the options for a feedback, following specification must be made:
- Code Name of the new Range of Values
- Description Description of the new Range of Values
- Data Type Data Type of the Range of Values
Then the value range options must be entered, line by line for a fixed selection of values.
Following Figure shows the definition of a value range to respond school marks:
Opening an Instruction
An Instruction is then created in which the previously created checklist tasks are selected.
With a search for „Instructions“ the list of instructions can be opened:
With click on „New“ a new instruction can be created.
Instruction „General“ Info Tab
To define an instruction following specification must be made in the “General” info tab:
Code |
Name of the new instruction. |
Description | Description of the new instruction. |
Resource Skill Code: |
Option to prescribe a resource skill for the processing of the instruction |
First Textline as Description |
Sliding field, takes the first line of the instruction as the description text. |
Note:
- It is recommended, to activate the sliding field „First Textline as Description“ and to write the Description of the instruction in the first line.
Instruction „Lines“ Info Tab
Following specification must be made in the “Lines” info tab
Instruction Type | The choice is to leave the field blank or to select the "Position" option. The latter must be selected if a checklist task is to be selected. |
Task No. | The choice is, to leave the field blank or to select an existing checklist task. |
Text | An instruction text or checkliste text can be entered. |
Mandatory | Sliding field to define, that a checklist task expects a feedback. Is the sliding field activated, the checklist task must be defined. |
With the function „Transfer to Task“ (see „Manage“), a new created text can be added as a Checklist Task.
Following Figure shows an instruction, that includes checklist tasks. All 3 tasks expect a feedback, see „Mandatory“ checkbox.
The Checklist „I-TS-AFC“ can now be added in an air filter change work order in the work order texts as “instruction”, the procedure to do so is explained in the examples.
Before the work order can be reported “Finished”, all 3 checklist tasks must be responded or confirmed in the work order.
Comments
0 comments
Article is closed for comments.