Enter and change budgeted amounts

  • Updated

You enter the budgeted amounts on the Work Order Budget page per period, for individual cost types or as a total amount. maintool saves every entry and every later change as a work order budget entry so that you can trace how a budget has developed. For a new budget with the same structure, you copy an existing budget as a template.

Prerequisites

Set the period

The amounts in the lines always apply to the period in the Date Filter. Therefore, first set the period for which you are planning.

  1. Search for Work Order Budgets, select the budget name, and choose Edit Budget.
  2. On the General FastTab, in View by, select the length of the period, for example Year or Month.
  3. Set View as to Net Change. Each line then shows the amounts of exactly this period.
  4. Use Previous Set and Next Set until the desired period appears in the Date Filter on the Filters FastTab. You can also enter the Date Filter directly.
  5. On the Options FastTab, leave only valid lines turned on if you only want to see budgets and positions that are valid in the period.

Additional settings:

  • Fiscal Year (Options FastTab): With View by Year, the period is then based on the fiscal year from your accounting periods instead of the calendar year.
  • Rounding Factor (General FastTab): Shows the amounts in thousands, for example. Entries then apply on the same scale: with 1000, an entry of 5 corresponds to an amount of 5,000.
  • View as Balance at Date: The lines show all amounts and costs up to the end of the period. This way you monitor budgets that run over several years against their total amount.

Enter amounts

  1. Go to the line of the position. You can only enter amounts in lines of the type Position and Budget.
  2. Enter the planned amount:
    • per cost type in Material Budgeted Amount, Resource Budgeted Amount, and External Service Budgeted Amount, or
    • as a total amount in Total Budgeted Amount if you do not plan by cost type.
  3. You can enter costs that are expected but not yet posted in Expected Costs. They reduce the value in Available.

Total Budgeted Amount always shows the total of all cost types and the total amounts entered directly. Lines of the type Budget add up the amounts of their positions, lines of the type Amount the amounts that you specified there in Sum up.

Recommendations:

  • Plan on positions if the costs can be clearly assigned. Work orders, and therefore the costs, are always assigned to a position.
  • For budgets and positions that run over several years, plan the outflow of funds per year. The more precisely you know the outflow of funds, the smaller the period you can select in View by.

Change amounts and trace changes

A budgeted amount is never overwritten. When you change a value, maintool creates a work order budget entry for the difference. The amount in the line is the total of all entries in the period.

  1. Set the period in which you want to change the amount (see above).
  2. Enter the new value in the cell. maintool creates an entry for the difference from the previous value, dated on the first day of the Date Filter.
  3. In the cell, choose the button to the right of the amount. The Work Order Budget Entries page shows all entries of this cell with Date and Amount.
  4. For the new entry, enter the reason for the change in Description, for example the number of an approval.

On the Work Order Budget Entries page, only the Description can be edited. You can neither create nor delete entries there; you always enter corrections as a new value in the cell.

Copy a budget as a template

With Copy budget, you transfer the structure of a budget name or of a single budget to another budget name, for example for the next fiscal year.

  1. On the Work Order Budgets page, create the target budget name, see Create and structure a budget.
  2. Open the budget that you want to copy with Edit Budget. If you only want to copy a single budget with its positions, select its line.
  3. Choose Function > Copy budget. The Copy Work Order Budget page opens.
  4. Under Copy from, check the Budget Name and the Budget. If Budget is empty, maintool copies all lines of the budget name.
  5. Under Copy to, select the target Budget Name.
  6. Turn on Inherit Programm Controls if the settings for hiding values (Fade out Type, Fade out No., etc.) are also to be copied.
  7. Choose OK and confirm the question Do you want to start copying? At the end, maintool shows The copying was successful!

For each line, maintool copies Type, No., Description, Budget No. from, Budget Type, Sum up, Sum up Position, the number series, and the comments. The budgeted amounts, Valid from, Valid until, Blocked, Approved by, Vendor, and Completed are not copied. Then enter the amounts and validity periods again in the new budget name. The target budget name must not yet contain any lines with the same numbers.

Result

The budgeted amounts are in the budget per period and cost type. As soon as work orders are assigned to the positions, you compare the amounts with the costs on the same page.

Enter and change amounts with View as Net Change so that each entry is dated on the start of the displayed period. If you delete a line of the type Budget or Position that has budgeted amounts, maintool asks for confirmation before it deletes the related entries.