Enter default values for the extrapolation

  • Updated

For object monitoring lines of the monitoring type Counter or Attrition / Consumption, you specify default values: the expected increase or decrease per day, for example 16 operating hours on every working day. From this, maintool extrapolates when the next value is likely to be reached and shows these dates in the date preview. Without default values, there is no date preview for such lines.

Prerequisites

Open the default values

  1. On the technical object, open the Object Monitoring Lines with the Monitoring action.
  2. Select the line and choose Object Monitoring Line › Default Values Extrapolation. The action is also available on the Object Monitoring Line - Card.

The Default Value Projection page shows the lines of the object with the same Template Code and one column per period with the sum of the default values:

  • On the Matrix Options FastTab, use View by to define which period a column covers (for example day or week). With View as, you choose Net Change (values of the period) or Balance at Date (sum up to the end of the period).
  • With Previous Column and Next Column you move by one column, with Previous Set and Next Set by 12 columns.
  • When you click a value, the Default Value Projection Entries page opens with the individual daily values.

Create values

  1. Select the object monitoring line in the matrix and choose Planning › Set Values. The Default Value Projection Settings page opens.
  2. Enter the Starting Date and Ending Date of the period.
  3. For Monday to Sunday, enter the expected value per day, for example 16 for Monday to Friday and 0 for Saturday and Sunday. The Week Total field shows the sum.
  4. Choose Add Capacity and confirm the question Do you want to change the values for …? with Yes.

Result: maintool creates a projection entry for each day of the period, displays The values for … days was changed successfully. and recalculates the date preview of the line. The values appear in the matrix.

maintool cancels if the starting date is after the ending date, a date is missing or all weekdays are 0 (You must specify default values.).

How maintool uses the default values

  • The starting point is the posted performance characteristics value of the line. From the following day onward, maintool adds the default values day by day until the next value is reached. This day becomes a preview date. maintool then continues with the following interval.
  • The preview extends to the end of the Date Preview Period or to the Scheduling End Date-Time of the line.
  • For Attrition / Consumption, the default values are the expected decrease per day.
  • You can see the preview dates in the date proposal with the Preview option and on the line under Handlings › Previews. You cannot create a work order from preview dates.

Notes and limitations

  • Add Capacity adds to the existing values. If you create values for a period a second time, maintool adds them to the existing daily values.
  • There are no default values for the monitoring type Threshold / Range; the page only shows lines with Counter or Attrition / Consumption.
  • The default values only determine the date preview. The actual date proposal is based on the posted performance characteristics.