With an object monitoring line of the monitoring type Counter or Attrition / Consumption, you trigger a recurring activity based on a meter reading or on consumption – for example, a check of the oil pump every 1,000 operating hours or an inspection of the oil tank after every 400 liters withdrawn. A time schedule describes the activity. maintool proposes it in the date proposal as soon as the posted performance characteristics reach the next value.
Prerequisites
- There is an object monitoring template with the Type of Monitoring Counter or Attrition / Consumption, see Set up object monitoring templates.
- There is a time schedule with the Type Object Monitoring Template for the activity, see Create a time schedule with object reference.
- The technical object is a component address, a technical component or a vehicle. You cannot select a Template Code for mounting positions.
Create an object monitoring line with a time schedule
- Open the technical object and choose the Monitoring action. The Object Monitoring Lines page opens.
- Create a new line and select the object monitoring template in the Template Code field.
maintool copies the Type of Monitoring, Description and Unit of Measure Code from the template – and the Time Schedule No. if the template has one. - If the Time Schedule No. is still empty, select the time schedule for the activity. maintool copies the descriptions of the time schedule to the line.
- Choose Object Monitoring Line › Card. The Object Monitoring Line - Card opens.
- On the General FastTab, check the Set next Action at field. It determines at which stage of the work order maintool calculates the next value (default: Finishing).
- Fill in the Counter or Attrition / Consumption FastTab as described below.
Select the Template Code first and only then the time schedule. If the Time Schedule No. is already filled in, maintool rejects a template code.
Counter FastTab
| Field | Meaning |
| Initial Value | Meter reading from which maintool calculates. The first next value is Initial Value + Interval. |
| Interval | Distance between two activities, for example 1,000 operating hours. Without an interval, no date proposal is created. |
| Ultimate Value | Highest reading of the counter before it starts again from the beginning (counter overflow). If the next value is above the ultimate value, maintool converts it to the new counter cycle. The ultimate value must not be smaller than the last posted meter reading. |
| Tolerance Value | Lead time: maintool proposes the activity as soon as the meter reading is between Next Action by Value minus the tolerance value and Next Action by Value. |
| Inherit Actual Value from Type, No., Line No. | The line takes over the meter reading of another object monitoring line with the same template, for example the operating hours of the engine for the oil pump. See Link a technical object to an object monitoring template. |
| Default Value Projection | Sum of the expected increases for the date preview, see Enter default values for the extrapolation. |
| Actual Value, Total Value, Last Action by Value, Next Action by Value | Display only: posted values, meter reading at the last activity and the value at which the next activity is due. |
Attrition / Consumption FastTab
With attrition and consumption, the value decreases, for example the content of a tank or the tread depth of a tire.
| Field | Meaning |
| Initial Value | Value when new or full stock, for example 2,000 liters. Without an initial value, no date proposal is created. |
| Interval | Decrease after which the activity is due, for example 400 liters. The next value is the value at the last activity minus the interval. If it becomes smaller than 0, maintool starts again at the initial value. |
| Critical Value | Must be smaller than Initial Value minus Tolerance Value. In the date preview, maintool starts again at the initial value when the value falls below this value. |
| Tolerance Value | Lead time: maintool proposes the activity as soon as the value is between Next Action by Value and Next Action by Value plus the tolerance value. |
| Default Value Projection | Sum of the expected decrease for the date preview. |
Result: How the date proposal is created
The basis is the performance characteristics posted for the object monitoring line – via the performance characteristics journal or a checklist, see Record and post performance characteristics in the journal. maintool compares the last value posted in the period of the date proposal with Next Action by Value:
- Counter: The activity is due when the value exactly reaches the next value or is within the tolerance range. If it is higher, the line is overdue.
- Attrition / Consumption: The activity is due when the value exactly reaches the next value or is within the tolerance range. If it is lower, the line is overdue.
- The date proposal shows overdue lines with Created by Overdue Object Monitoring Line, and only with View as Balance at Date.
You create the work order from the date proposal, see Create a work order from a date proposal. You can also create it directly on the card with Functions › Create Work Order; for this, the Interval (for attrition / consumption also the Initial Value) must be filled in.
As soon as the work order reaches the stage defined in Set next Action at, maintool calculates the next value: meter reading at this point in time plus interval, or for attrition / consumption minus interval. Until then, no further date proposal is created for the line.
Notes and limitations
- Without a Time Schedule No., Initial Value, Interval, Tolerance Value and Critical Value cannot be edited. Such a line is only used to record performance characteristics and does not trigger an activity.
- There are no performance characteristics for mounting positions, and therefore no date proposals based on meter reading or consumption.
- Without a Tolerance Value, a counter is only due if the posted value exactly hits the next value; any higher value counts as overdue. A tolerance value ensures that the activity appears as due in time.
Related articles
- Link a technical object to an object monitoring template
- Enter default values for the extrapolation
- Create a work order from a date proposal
- Appointment management overview
Related to