In maintool, you plan and post external services, external material and external resources with dedicated items, without keeping inventory. An external service item is an item of the type Service to which you assign an Item Type on the collana maintool FastTab. This article describes how to create such items. To learn how to use them in a work order, see Plan and post external services in a work order.
The three item types
There are three item types for external service items. In the work order, you plan and post all three in the same way, as a line of the Type External Service. The item type determines the cost type under which maintool records the costs: the Work Order Statistics show planned and posted amounts separately as External Services, External Materials and External Resources.
| Item type | Used for | Examples |
| External Service | working time of external companies | acceptance test by a service provider, fire extinguisher maintenance |
| External Material | material that is not kept in inventory | small material such as screws, nuts, sealing rings |
| External Resource | external equipment or persons | aerial work platform on loan, external expert |
Prerequisites
- You have decided which product posting group is used to post external services, see Plan account assignment: business transactions and posting groups.
- On the Work Order Posting Setup page, there is a line with this product posting group for each work order posting group, and the External Service Expense Account is filled in there. maintool uses this line to post the costs of the external service to the general ledger, see Set up the work order posting setup.
Create an external service item
- Create a new item in Business Central. If you create many external service items, it is worth setting up a separate item template and, if required, a separate number series so that you can recognize external service items by their number.
- Enter a Description. maintool copies it to the planning line of the work order.
- Set Type to Service.
maintool automatically sets the Item Type to External Service. - Select the Base Unit of Measure, for example hour or piece. maintool suggests it as the unit of measure in the planning line.
- Select the Gen. Prod. Posting Group and the VAT Prod. Posting Group.
- If there is a preferred supplier, enter it in Vendor No. maintool suggests it in the planning line as Buy-from Vendor No.
- On the collana maintool FastTab, select the Item Type: External Service, External Material or External Resource.
For work orders with capitalization, you can also enter the Overhead Rate % (Capitalization) of the item. maintool copies it to the planning line.
Result
The item is available in the work order: if you select the Type External Service in a planning line, the selection in No. shows all items of the type Service that are not blocked. maintool copies the description, base unit of measure, vendor and overhead rate from the item. The next steps are described in Plan and post external services in a work order.
Notes and limitations
Type and Item Type must match. The type Service only allows External Service, External Material and External Resource; inventory items have no item type; non-inventory items have no item type or the item type Std.-Invoice Text. If they do not match, maintool rejects the entry.
If you change the Type or apply an item template, maintool resets the Item Type: to External Service for Service, otherwise to blank. Therefore, select the item type last.
You can no longer change the Item Type as soon as item ledger entries, work order lines or work order ledger entries exist for the item.
Related articles
- Plan and post external services in a work order
- Set up the work order posting setup
- Set up standard invoice text items
Related to