Set up resource groups for work order planning

  • Updated

With resource groups, you plan capacity in work orders when it is not yet clear which person will do the work. To use resource groups in the planning lines, you define a base unit of measure for each group and, if required, further units of measure, for example day in addition to hour. This article describes the setup and where you can see what a group or resource is planned for.

Prerequisites

  • The resource groups are set up in Business Central, and the resources are assigned to their group (resource card, Resource Group No. field).
  • The units of measure that you want to use exist on the Business Central Units of Measure page.

Define the base unit of measure

  1. Search for Resource Groups and open the page.
  2. In the line of the group, select the unit in which the group is planned in the Base Unit of Measure field, for example hour.
    maintool automatically creates this unit as a unit of measure of the group with a Qty. per Unit of Measure of 1.

You can also change the base unit of measure on the Resource Group Units of Measure page in the Current Base Unit of Measure section. As soon as work order ledger entries exist for the group, the base unit of measure can no longer be changed.

Create further units of measure

  1. On the Resource Groups page, select the group and choose Planning > Units of Measure.
    The Resource Group Units of Measure page opens. The base unit of measure is shown in bold.
  2. In a new line, select the unit in the Code field.
  3. In Qty. per Unit of Measure, specify how many base units the unit corresponds to. If the base unit of measure is hour and the unit is day, enter 8, for example.
  4. Leave Related to Base Unit of Meas. turned on if the unit can be converted into the base unit of measure. If you turn the field off, maintool sets Qty. per Unit of Measure to 1.

The Qty. per Unit of Measure must be greater than 0, and always 1 for the base unit of measure. You can neither delete nor rename the line of the base unit of measure.

Units of measure and prices in the planning lines

  • If you enter a line of the Type Resource Group, maintool suggests the base unit of measure of the group. Only the units of measure of the group are available. This applies to work order lines, time schedule lines, work plan lines and contract activity lines.
  • With a Work Type Code, maintool uses the unit of measure of the work type, see Enter planning lines.
  • maintool determines the unit cost and unit price of the line from the prices set up in Business Central for the resource group, per work type if required. maintool converts prices for the base unit of measure into the unit of measure of the line using the Qty. per Unit of Measure.
  • In price lists, you can select one of the group's units of measure in the Unit of Measure Code field for a resource group.

maintool shows whether a resource group is overbooked on a day as a resource group conflict. This is based on the capacity of the resources assigned to the group, see Availability conflicts in the work order.

Show planned work order lines

  • On the Resource Groups page, Planning > Res. Group per Work Order opens the Work Order Line List with all work order lines of the group, sorted by execution date. This includes the lines of the resources assigned to the group.
  • On the Resources page, Planning > Resources per Work Order opens the Work Order Line List with all work order lines of the resource.

The list is read-only. You specify which persons appear on the schedule board on the individual resource, see Use the schedule board.

Available from version 20261000.0: units of measure for resource groups (Resource Group Units of Measure page), transfer of the group prices into the unit of measure of the line, and the actions Res. Group per Work Order and Resources per Work Order. During the update, maintool creates the unit of measure previously entered for a group as its base unit of measure.