maintool comes with its own reports for maintenance: analyses of work orders, costs, damage and technical objects, work documents for printing, and register reports. This article shows where to find the reports, which options many of them share and which article describes which report.
Where to find reports
-
Maintenance Role Center: Each menu group has a Reports subgroup.
- Design > Reports: reports on component addresses, mounting positions, technical components and vehicles.
- Planning > Reports: analyses of work orders, costs, damage and types of activity, and register reports.
- Execution > Reports: work documents, time recording, posting lists, test reports of the journals, and reports that post.
- Costing > Reports: Update Prices in Time Schedules.
- Maintenance - Manager, Maintenance - Workplanner and Maintenance - Worker Role Centers: Under Reports you find Work Order Statistics (Top 10), Work Order Statistics (Top 10 Technical Object) and Work Order Card.
- Search: You can also find most reports using search (Alt+Q) with their name.
Which Role Center you use is determined by your profile, see Role Centers – overview and assignment.
Running a report
- Open the report from the Role Center or using search. The request page of the report opens.
- On the Options tab, specify what the report analyzes and how it presents it.
- Set the filters on the filter tabs, for example Work Order. The filter fields shown are suggestions; as with any Business Central report, you can add further fields.
- Preview the report, print it or save it as a file.
Most analyses remember the options you selected last and suggest them again the next time.
Options found in several reports
| Option | Meaning |
| Date Filter (Posting Date) | Period for the posting date of the entries. Use it to analyze the posted costs of a period. |
| Date Filter (Execution Date) | Period for the execution date of the work order or of the entries. |
| Date Filter (Document Date) | Period for the document date of the work order or of the entries. |
| Amount of Results | Number of places in the top 10 reports, default 10. |
| Grouping | Groups a list by a characteristic, for example by customer or malfunction code, with subtotals. |
| Print summary | Inserts a totals line at the end of a list. |
| Extended Work Order Description | Prints Description 2 and Description 3 of the work order in a separate line. |
How each option works in which report is described in the respective article.
All reports at a glance
The locations refer to the Maintenance Role Center.
Analyzing work orders and costs
| Report | Purpose | Location | Described in |
| Work Order List | Work orders with status, dates and responsibilities | Planning, Execution | Work order lists |
| Work Order List - Sales | Planned, posted and sales amounts per work order, optionally per customer | Planning | Work order lists |
| Work Order List - Duration / Standstill | Work order duration or standstill duration per work order, grouped by a characteristic | Planning | Work order lists |
| Work Order List - Budget | Planned amount per work order, structured by budget and budget position | Planning | Work order lists |
| Work Order List - Commercial | Fields relevant for posting per work order, optionally with amounts | Planning | Work order lists |
| Work Order Statistics Costs (Top 10) | Work orders with the highest costs | Planning | Top 10 work order analyses |
| Work Order Statistics Quantity (Top 10) | Work orders with the most resource hours | Planning | Top 10 work order analyses |
| Work Order Statistics (Top 10 Technical Object) | Technical objects with the highest costs | Planning | Top 10 work order analyses |
| Work Order Standstill (Top 10 Technical Object) | Technical objects with the longest standstill | Planning | Top 10 work order analyses |
| Work Order Statistics | Planned, actual, expected, posted and sales amounts per work order; planned and reported times | Planning | Analyzing work order costs |
| Cost Consolidation (Technical Object) | Costs per technical object including all subordinate objects | Planning | Analyzing work order costs |
| Work Order Movements | Consumption and purchase entries per work order | Execution | Analyzing work order costs |
| Work Order Posting List | Costs per account or dimension value, by work order or budget position | Execution | Analyzing work order costs |
| Work Order Budget | Budgeted amounts, costs and available amounts per budget line | Planning | Analyzing work order costs |
Analyzing damage and types of activity
| Report | Purpose | Location | Described in |
| Damage Identifications | Frequency of type, figure and cause of damage in work orders and the costs on the objects | Planning | Analyzing damage and types of activity |
| Types of Activity Tendencies | How often types of activity occur in posted work order feedbacks and how long the work took, per period | Planning | Analyzing damage and types of activity |
Technical objects
| Report | Purpose | Location | Described in |
| Component Address, Component Address List | Component addresses individually or as a list, optionally with data sheet | Design | Technical object reports |
| Mounting Position, Mounting Position List | Mounting positions individually or as a list, optionally with data sheet | Design | Technical object reports |
| Technical Component, Technical Components List | Technical components individually or as a list, optionally with bill of materials and data sheet | Design | Technical object reports |
| Vehicle, Vehicle List | Vehicles individually or as a list, optionally with data sheet | Design | Technical object reports |
| Vehicle Technical Component List | Technical components per vehicle | Planning | Technical object reports |
| Technical Component Life Cycle | Installations and removals, work order requests, work orders and feedbacks of a technical component by date | Planning | Technical object reports |
Work documents and time recording
| Report | Purpose | Location | Described in |
| Work Order Card | Work order with detail lines and planning lines for printing | Execution; also on the work order card | Printing work documents |
| Material Requisition | Items from the planning lines of a work order | Execution; also on the work order card | Printing work documents |
| Material Requisition - Date Proposal Worksheet | Items of the time schedule lines for date proposals | Execution | Printing work documents |
| Work Order Texts | Text lines of work orders | Execution | Printing work documents |
| ToDo List (Work Order Request) | Open work order requests with detail lines | Execution | Printing work documents |
| Time Recording List, Time Recording Card | Posted resource hours per resource and day, or one posted time recording | Execution | Record and post times |
Registers
| Report | Purpose | Location | Described in |
| Work Order Register - Value | Work order registers with their value entries and totals | Planning | Work order registers and entries |
| Performance Characteristics Register | Performance characteristic registers with their performance characteristic ledger entries | Planning | Performance characteristic registers and entries |
| Technical Component Register | Technical component registers with their technical components ledger entries | Planning | Technical component registers and entries |
Reports that process data, and test reports
Some entries under Reports do not analyze anything; instead they post or change data, or they check a journal before posting. They are described in the articles on the respective process.
| Report | Purpose | Location | Described in |
| Post Work Order Cost to G/L | Posts the costs of work orders to the general ledger | Execution; also in the Business Central Finance Manager Role Center under Maintenance Management > Costing | Post work order cost to G/L |
| Transfer of a Work Order | Reposts entries to another work order, account, budget or other dimensions | Execution | Transfer of a work order |
| Adjust Cost - Item Movements | Adjusts the work order entries to adjusted unit costs of items | Business Central Finance Manager Role Center under Maintenance Management > Costing | Reclassify and readjust postings |
| Update Prices in Time Schedules | Updates the prices in the lines of time schedules | Costing | Update prices in time schedules |
| Reinitialize Date Preview | Recalculates the date preview | Planning; Design > Technical Facility Management > Periodic Activities | Set up the date preview |
| Work Order Journal - Test | Checks the lines of the work order journal before posting | Execution | Post hours and material in the work order journal |
| Performance Characteristics Journal - Test | Checks the lines of the performance characteristics journal before posting | Execution | Record and post performance characteristics in the journal |
| Techn. Component Journal - Test | Checks the lines of the technical component journal before posting | Execution | – |
Related articles
- Work order lists
- Top 10 work order analyses
- Analyzing work order costs
- Analyzing damage and types of activity
- Technical object reports
- Printing work documents
Related to