Reports overview

  • Updated

maintool comes with its own reports for maintenance: analyses of work orders, costs, damage and technical objects, work documents for printing, and register reports. This article shows where to find the reports, which options many of them share and which article describes which report.

Where to find reports

  • Maintenance Role Center: Each menu group has a Reports subgroup.
    • Design > Reports: reports on component addresses, mounting positions, technical components and vehicles.
    • Planning > Reports: analyses of work orders, costs, damage and types of activity, and register reports.
    • Execution > Reports: work documents, time recording, posting lists, test reports of the journals, and reports that post.
    • Costing > Reports: Update Prices in Time Schedules.
  • Maintenance - Manager, Maintenance - Workplanner and Maintenance - Worker Role Centers: Under Reports you find Work Order Statistics (Top 10), Work Order Statistics (Top 10 Technical Object) and Work Order Card.
  • Search: You can also find most reports using search (Alt+Q) with their name.

Which Role Center you use is determined by your profile, see Role Centers – overview and assignment.

Running a report

  1. Open the report from the Role Center or using search. The request page of the report opens.
  2. On the Options tab, specify what the report analyzes and how it presents it.
  3. Set the filters on the filter tabs, for example Work Order. The filter fields shown are suggestions; as with any Business Central report, you can add further fields.
  4. Preview the report, print it or save it as a file.

Most analyses remember the options you selected last and suggest them again the next time.

Options found in several reports

Option Meaning
Date Filter (Posting Date) Period for the posting date of the entries. Use it to analyze the posted costs of a period.
Date Filter (Execution Date) Period for the execution date of the work order or of the entries.
Date Filter (Document Date) Period for the document date of the work order or of the entries.
Amount of Results Number of places in the top 10 reports, default 10.
Grouping Groups a list by a characteristic, for example by customer or malfunction code, with subtotals.
Print summary Inserts a totals line at the end of a list.
Extended Work Order Description Prints Description 2 and Description 3 of the work order in a separate line.

How each option works in which report is described in the respective article.

All reports at a glance

The locations refer to the Maintenance Role Center.

Analyzing work orders and costs

Report Purpose Location Described in
Work Order List Work orders with status, dates and responsibilities Planning, Execution Work order lists
Work Order List - Sales Planned, posted and sales amounts per work order, optionally per customer Planning Work order lists
Work Order List - Duration / Standstill Work order duration or standstill duration per work order, grouped by a characteristic Planning Work order lists
Work Order List - Budget Planned amount per work order, structured by budget and budget position Planning Work order lists
Work Order List - Commercial Fields relevant for posting per work order, optionally with amounts Planning Work order lists
Work Order Statistics Costs (Top 10) Work orders with the highest costs Planning Top 10 work order analyses
Work Order Statistics Quantity (Top 10) Work orders with the most resource hours Planning Top 10 work order analyses
Work Order Statistics (Top 10 Technical Object) Technical objects with the highest costs Planning Top 10 work order analyses
Work Order Standstill (Top 10 Technical Object) Technical objects with the longest standstill Planning Top 10 work order analyses
Work Order Statistics Planned, actual, expected, posted and sales amounts per work order; planned and reported times Planning Analyzing work order costs
Cost Consolidation (Technical Object) Costs per technical object including all subordinate objects Planning Analyzing work order costs
Work Order Movements Consumption and purchase entries per work order Execution Analyzing work order costs
Work Order Posting List Costs per account or dimension value, by work order or budget position Execution Analyzing work order costs
Work Order Budget Budgeted amounts, costs and available amounts per budget line Planning Analyzing work order costs

Analyzing damage and types of activity

Report Purpose Location Described in
Damage Identifications Frequency of type, figure and cause of damage in work orders and the costs on the objects Planning Analyzing damage and types of activity
Types of Activity Tendencies How often types of activity occur in posted work order feedbacks and how long the work took, per period Planning Analyzing damage and types of activity

Technical objects

Report Purpose Location Described in
Component Address, Component Address List Component addresses individually or as a list, optionally with data sheet Design Technical object reports
Mounting Position, Mounting Position List Mounting positions individually or as a list, optionally with data sheet Design Technical object reports
Technical Component, Technical Components List Technical components individually or as a list, optionally with bill of materials and data sheet Design Technical object reports
Vehicle, Vehicle List Vehicles individually or as a list, optionally with data sheet Design Technical object reports
Vehicle Technical Component List Technical components per vehicle Planning Technical object reports
Technical Component Life Cycle Installations and removals, work order requests, work orders and feedbacks of a technical component by date Planning Technical object reports

Work documents and time recording

Report Purpose Location Described in
Work Order Card Work order with detail lines and planning lines for printing Execution; also on the work order card Printing work documents
Material Requisition Items from the planning lines of a work order Execution; also on the work order card Printing work documents
Material Requisition - Date Proposal Worksheet Items of the time schedule lines for date proposals Execution Printing work documents
Work Order Texts Text lines of work orders Execution Printing work documents
ToDo List (Work Order Request) Open work order requests with detail lines Execution Printing work documents
Time Recording List, Time Recording Card Posted resource hours per resource and day, or one posted time recording Execution Record and post times

Registers

Report Purpose Location Described in
Work Order Register - Value Work order registers with their value entries and totals Planning Work order registers and entries
Performance Characteristics Register Performance characteristic registers with their performance characteristic ledger entries Planning Performance characteristic registers and entries
Technical Component Register Technical component registers with their technical components ledger entries Planning Technical component registers and entries

Reports that process data, and test reports

Some entries under Reports do not analyze anything; instead they post or change data, or they check a journal before posting. They are described in the articles on the respective process.

Report Purpose Location Described in
Post Work Order Cost to G/L Posts the costs of work orders to the general ledger Execution; also in the Business Central Finance Manager Role Center under Maintenance Management > Costing Post work order cost to G/L
Transfer of a Work Order Reposts entries to another work order, account, budget or other dimensions Execution Transfer of a work order
Adjust Cost - Item Movements Adjusts the work order entries to adjusted unit costs of items Business Central Finance Manager Role Center under Maintenance Management > Costing Reclassify and readjust postings
Update Prices in Time Schedules Updates the prices in the lines of time schedules Costing Update prices in time schedules
Reinitialize Date Preview Recalculates the date preview Planning; Design > Technical Facility Management > Periodic Activities Set up the date preview
Work Order Journal - Test Checks the lines of the work order journal before posting Execution Post hours and material in the work order journal
Performance Characteristics Journal - Test Checks the lines of the performance characteristics journal before posting Execution Record and post performance characteristics in the journal
Techn. Component Journal - Test Checks the lines of the technical component journal before posting Execution –

Related articles

Related to

Was this article helpful?

0 out of 0 found this helpful

Have more questions? Submit a request