On the Date Proposal Worksheet page, you see due, overdue and upcoming dates from time schedules and object monitoring lines for a period of your choice and with your own filters. From here, you create work orders or print a material requisition. The date proposals of your Role Center, on the other hand, are in the Date Proposal List, see Create a work order from a date proposal.
Prerequisites
- There is a date proposal name that is not intended for the Role Center and for which the Time Schedule and/or Object Monitoring Line options are enabled. See Set up date proposals for work planning.
Open the Date Proposal Worksheet page
- Use the search (Alt+Q) to find Date Proposal Worksheet and open the page. Alternatively, select a name in the Date Proposal Names list and choose the Edit Date Proposal Name action.
- In the Name field, select the date proposal name. maintool applies its options and filters and calculates the lines.
- Choose the period (see below). With Update, maintool recalculates the lines at any time.
Choose the period
| Field or action | Meaning |
| Starting Date, Ending Date | Period of the date proposals. The Next Action at Date-Time of the date is decisive. |
| View by | Length of the period: Day, Week, Month, Quarter, Year or Accounting Period. maintool sets the starting and ending date to the matching period. |
| View as |
|
| Group on | Period of the group lines for object monitoring lines, see Lines and grouping. |
| Previous Set, Next Set | Move the period back or forward by the length from View by. |
| Today | Jumps to the period that contains today's date. |
If the time schedule or object monitoring line has a Due Date Calculation, a date only counts as overdue with Balance at Date once the due date calculation has also expired.
Options
Use Show Options to show the options and Hide Options to hide them again. The options define which sources maintool considers:
- Time Schedule: dates from time schedules without object reference.
- Object Monitoring Line: dates from object monitoring lines.
- Grouping of Object Monitoring Lines: groups dates from object monitoring lines under group lines.
- Work Order Request: additionally registered work order requests.
- Work Order: additionally work orders with a work order status value from 100 to 299 whose Execution Date-Time is within the period.
- Preview: additionally preview dates, see Set up the date preview.
- Only valid Lines: option for the calculation, enabled by default.
The options and filters come from the date proposal name. If you change them on the page, the change only applies to the open page. If Automatic Update Lines is disabled for the date proposal name, maintool only recalculates the lines with Update. Until then, the page title shows (Not Actual).
Filters
Use Show Filters to show the filters and Hide Filters to hide them again. A date proposal only appears if the time schedule meets the filter values.
| Filter | Effect |
| Shift | Shift of the time schedule. maintool also copies the starting and ending time of the shift to Starting Time and Ending Time. |
| Starting Time, Ending Time | Only dates whose time is in between. If the Ending Time is before the Starting Time, the period extends past midnight. |
| Work Order Duration from, Work Order Duration until | Work Order Duration of the time schedule. |
| Malfunction Code | Filter on the malfunction code. |
| Work Order Priority Code, Type of Activity Code, Person in Charge No., Res. Department No. | Fields of the time schedule with the same name. |
| Resource No., Resource Group No. | Date proposals from object monitoring lines only appear if the time schedule contains a line with this resource or resource group. |
| Reference Object, Detail No. | Object type and objects of the object monitoring lines. You can only enter a Detail No. once a Reference Object is selected; otherwise Please specify a reference Object. appears. |
Lines and grouping
Each line is a date. The columns show, among other things, Next Action at Date-Time, Description, Time Schedule No., Type of Monitoring, Reference Object, Detail No., Time Interval, Due Date Calculation and, for counters, Actual Value and Next Action by Value. The hidden column Created by shows where a line comes from, for example Time Schedule or Overdue Object Monitoring Line.
- Overdue dates and overdue work orders are highlighted in red.
- Preview dates are shown in a different color.
- With Grouping of Object Monitoring Lines, a group line in bold summarizes the dates of all objects of the same time schedule. For the type of monitoring Date, this includes all dates that fall within the same period from Group on (for example the same Day or the same Week). The individual objects are listed below.
Further actions
- Line › Card opens the origin of the line, for example the time schedule, the object monitoring line, the work order or the work order request. Line › Dimensions shows the dimensions.
- Function › Create Work Order or Expand Work Order › For Current Record / For Marked Records creates work orders or adds to an existing one. For the procedure and conditions, see Create a work order from a date proposal.
- Print › Material Requisition prints the Material Requisition - Date Proposal Worksheet report with the items from the time schedules of the date proposals, with location, bin and quantity.
Notes and limitations
- You cannot create work orders from preview dates or from lines of the source Work Order.
- If an expected date is missing, you will find the most common causes in No date proposal appears.