When the work is done, you report the work order as finished (status Finished). When all feedbacks are posted and the purchase documents are completed as well, you close it (status Closed). This article describes both steps, the checks maintool runs and how to report individual origin lines as finished.
Prerequisites
- The work order is at least in status Execution. You cannot switch directly from Planning, because Execution is a mandatory status.
- The work order is not blocked (Blocked toggle on the General FastTab).
- In the Work Order Management Setup, the fields Checklist Perf. Jnl. Templ. and Checklist Perf. Jnl. Batch on the Checklist FastTab are filled in. maintool checks this every time a work order is reported finished, even if the work order does not contain a checklist.
Finished and Closed
- Finished (300): The work is technically complete. You can still report and post, but the planning lines can no longer be changed. maintool fills in the Reported finish at Date-Time field.
- Closed (400): The work order is completely processed. It no longer appears in the Work Orders list but in Closed Work Orders. maintool fills in the Reported complete at Date-Time field.
By default, the Finished status is not mandatory. You can therefore also switch directly from Execution to Closed. maintool then first runs all checks of the finish report and also records the Finished step in the Work Order Status History.
With the standard setup, a finished or closed work order cannot be reset to an earlier status. See Work order status.
Work orders that were reported finished in maintool mobile have the status Reported finished in mobile. The app has already created a work order feedback for them. Check and post this feedback before you close the work order.
Report a work order as finished
- Open the work order and choose the Status Change action.
The Work Order Status List page opens. - Select Finished and confirm with OK.
- Answer the question Do you want to change the Work Order Status from Execution to Finished? with Yes.
- If asked, answer the questions about open origin lines and reservations (see below).
Result:
- The work order has the status Finished. The Reported finish at Date-Time field contains the work date and the current time, and the change is recorded in the Work Order Status History.
- Open origin lines are reported finished if you confirmed the question about them. If the work order comes from a time schedule or an object monitoring line, maintool updates the related date handling.
- maintool posts the results of activities from an object monitoring (work order texts with a Monitoring Template Code) as performance data for the technical object.
- If Send E-Mail is enabled for the work order category, maintool sends the emails set up for the Finished status. See Automatic email notifications.
Close a work order
- Post all open work order feedbacks and complete any purchase quotes and purchase orders for the work order.
- Open the work order and choose the Status Change action.
- Select Closed and confirm with OK.
- Answer the question Do you want to change the Work Order Status from … to Closed? with Yes.
maintool closes the work order card. You can then find the work order in the Closed Work Orders list. To change the status of several work orders at once, use the Work Orders list, see Work order status.
Checks when reporting finished and closing
Checks that stop the status change
If one of these checks fails, the status remains unchanged. Fix the cause and change the status again.
| Check | Message | Applies to |
| The work order is blocked. | Error message for the Blocked field | Finished, Closed |
| The work order is still in Planning, or another mandatory status would be skipped. | You can not change Work Order Status from … to …, because there is at least one unconsidered Work Order Status! | Finished, Closed |
| A result is mandatory for an activity but has not been entered. | The field "Result" is missing for job: … | Finished, Closed |
| An activity is not reported finished and Check Work Order Texts Finish is enabled in the Work Order Management Setup (General FastTab). | The current job has not been carried out jet: … | Finished, Closed |
| An activity is not reported finished and mandatory items of its checklist are unanswered. Does not apply to mounting positions. | Not all mandatory informations are filled in Instruction No. …. | Finished, Closed |
| An activity from an object monitoring has a Monitoring Template Code but no Line No. (Object Mon. Line). Does not apply if the reference object is a mounting position. | Error message for the Line No. (Object Mon. Line) field | Finished, Closed |
| The Checklist Perf. Jnl. Templ. or Checklist Perf. Jnl. Batch field in the setup is empty. | Error message for the empty field | Finished, Closed |
| There is an unposted work order feedback for the work order. | You can not change Work Order Status from … to Closed, because there is at least one unconsidered Work Order Feedback! | Closed |
| A purchase quote or purchase order still contains lines for this work order. | … because there is at least one unconsidered Purchase Quote! or … because there is at least one unconsidered Purchase Order! | Closed |
| The reference object is Technical Component and one of the technical components has the assignment Installation. | The Assignment of Technical Component … could not be Installation. | Closed |
How to work with activities and checklists in the work order is described in Add a checklist to a time schedule or work order. If Send E-Mail is enabled for the work order category and information required for sending is missing (for example the email address in the user setup), the status change is also stopped.
Questions
For these checks, maintool asks for confirmation. If you choose Yes, maintool continues the status change; if you choose No, it stops.
-
Open origin lines: There are …, wich are not reported-finished. Automatically reporting-finish from work order …?
If you choose Yes, maintool reports all open origin lines as finished with the time of the finish report. Lines marked as Not executed remain unchanged. If you choose No, the message You have to reporting-finish the remaining … in work order … manually. appears. -
Reservations: The Work Order Header … still contains reserved Quantities. Change Work Order Status and cancel reservations?
If you choose Yes, maintool cancels the reservations of the item lines. If you choose No, the message Work Order Status did not change! appears.
Fixed in version 20260900.2: If a work order contained several technical objects with activities from an object monitoring, the change to Finished could stop with an unjustified error message. If this happens in an older version, contact your maintool partner.
Report individual origin lines as finished
If a work order combines several origins, for example several dates from time schedules, you can report individual origin lines as finished before the work order itself. For a time schedule or an object monitoring line, maintool then enters the date in the date handling so that the next date can be calculated.
- Open the work order and choose the Origin Lines action.
The Work Order Origin Lines page opens. - Select the line and choose the Finish Work Order Text Line-Single action.
- Answer the question Do you want to finish Work Order Origin Line-Single? with Yes.
- Enter the date and time of the finish report and confirm.
The line now has Finished enabled, and the Action at Date-Time field shows the time you entered.
Further actions on the Work Order Origin Lines page:
| Action | Effect | Possible |
| Finish Work Order Text Line-Single | Reports the selected origin line as finished. | from Execution; only for work order requests, time schedules and object monitoring lines that are not marked as Not executed |
| Not execute Origin Line | Marks the origin line as Not executed and saves a reason (up to 30 characters) in the Reason for not Execution field. For time schedules and object monitoring lines, maintool removes the date from the date handling again. | from Execution; only for lines that are not reported finished |
| Insert Origin Line | Assigns another work order request, time schedule or object monitoring line to the work order. The available choice depends on the reference object. | up to before Finished; not for follow-up work orders or work orders from work order feedbacks or contracts |
If the work order is still in Planning, the message The status from Work Order Header … is not Execution or higher! appears.
Change the status when reporting or posting
- Posting a work order feedback and Report as Planned: The question when posting (Do you want to report work order consumptions now?) or for Report as Planned (Do you want to report the planned consumption for …?) contains the Work Order Status field. If you select Finished or Closed there, maintool changes the status after posting. See Create and post a work order feedback and Report a work order as planned.
- Post to G/L on the work order card: With the options Post and report Work Order finished and Post and Complete Work Order, maintool first posts the costs to the general ledger and then changes the status. See Posting setup – overview.
In both cases, the same checks run as for a change via Status Change.