In maintool, a checklist is an instruction with checklist tasks. So that the tasks are queried during the work, you assign the instruction to a time schedule or directly to a work order. From the time schedule, maintool transfers it to every work order created from it. This article describes both ways and what is transferred when the work order is created.
Prerequisites
- The instruction with the checklist tasks has been created. See Create an instruction with checklist tasks.
- For a work order: it does not yet have the status Finished. From Finished onwards, the Work Order Texts page can no longer be edited.
- If the checklist is to be assigned to a technical object, the object is assigned to the work order. See Assign technical objects to a work order.
Add a checklist to a time schedule
- Open the time schedule and choose the Texts action.
The Time Schedule Texts page opens. - In a new line, select Instruction in the Type field.
- In the Code field, select the instruction.
- Leave the field.
maintool inserts all lines of the instruction: the first line into the line with the code, all others directly below it.
Each line shows the Task No. and Text of the checklist task. maintool also transfers Data Type, Range of Values Code, Monitoring Template Code and Mandatory from the instruction. These columns are hidden on the Time Schedule Texts page; you can show them with Personalize if needed.
Add a checklist directly to a work order
- Open the work order and choose the Texts action.
The Work Order Texts page opens. Alternatively, choose the Edit action in the Work Order Texts FactBox. - In a new line, select Instruction in the Type field.
- In the Code field, select the instruction and leave the field.
maintool inserts all lines of the instruction. - If the checklist is to apply to a specific technical object, select the object in the Detail No. field in the first line of the instruction.
maintool copies the Detail No. to all lines of the instruction.
If a technical component is already entered as Detail No. in the line, the selection in the Code field shows only the instructions assigned to this component (Instruction References). Otherwise, you see all instructions.
If the checklist contains tasks used to record performance characteristics, these lines also need a Line No. (Object Monitoring Line). See Record performance characteristics with a checklist.
What is transferred when the work order is created
When a work order is created from a time schedule, maintool copies all time schedule texts to the work order texts – with Task No., Text, Data Type, Range of Values Code, Monitoring Template Code and Mandatory. The Result column is empty and Finished is not set.
- Type of Origin Time Schedule: The work order texts have no Detail No. Assign the technical object in the work order if needed.
- Type of Origin Object Monitoring Line: maintool enters the technical object of the object monitoring line as Detail No. For tasks with a Monitoring Template Code, maintool also fills in the Line No. (Object Monitoring Line), see Record performance characteristics with a checklist.
- Insert Origin Line: If you add a time schedule or an object monitoring line to an existing work order as an origin line, maintool appends the time schedule texts at the end of the work order texts. See Finish and close a work order.
The work order texts are a copy. If you later change the time schedule texts or the instruction, existing work orders remain unchanged.
Change and delete lines
- If you delete the first line of an instruction, maintool deletes all lines of this instruction.
- You cannot change the Type of a line as long as the Code field contains a value. maintool then reports that Type could not be changed if there is a value in the Code field.
- If you change the Task No. in a line, maintool transfers Text, Data Type, Range of Values Code and Monitoring Template Code of the new checklist task and resets Mandatory. In the work order texts, maintool also clears Result and Line No. (Object Monitoring Line).
- You change the Detail No. only in the first line of an instruction. maintool copies it to the other lines.
With the Type Work Notice, you insert a work notice instead of an instruction. Work notices are not checklists.