With a checklist, you record measured values such as meter readings or operating hours of a technical object during the work. When the work order is reported finished, maintool posts these values as performance characteristics to the object monitoring line of the object – with the same result as the performance characteristics acquisition in Technical Facility Management.
Prerequisites
- There is an object monitoring line with the matching object monitoring template for the technical object. See Object monitoring template setup and Linking a technical object to an object monitoring template.
- The checklist task has the Data Type Decimal and a Monitoring Template Code. You can only specify a monitoring template code for the data type Decimal. See Create a checklist task in the catalog.
- The task is part of an instruction. See Create an instruction with checklist tasks.
- In the Work Order Management Setup, the fields Checklist Perf. Jnl. Templ. and Checklist Perf. Jnl. Batch on the Checklist FastTab are filled in. If they are missing, every finish report is canceled, see Finish and close a work order.
- The work order has a Reference Object, and the technical object is assigned to it. See Assign technical objects to a work order.
How checklist and performance characteristics are linked
In the work order texts, two fields link a checklist task to the object monitoring line:
- Detail No. – the technical object,
- Line No. (Object Monitoring Line) – the object monitoring line of this object whose template matches the Monitoring Template Code of the task.
Employees enter the measured value in the Result field. When the work order is reported finished, maintool posts it to this object monitoring line.
Work order from an object monitoring line
If the work order is created from an object monitoring line (Type of Origin Object Monitoring Line), maintool fills in both fields itself:
- Detail No. is the object of the object monitoring line.
- Line No. (Object Monitoring Line) is the triggering object monitoring line if its template matches the monitoring template code of the task. Otherwise, maintool searches the object for an object monitoring line with this template. If there is exactly one, maintool enters it. Lines with a status, for example Blocked, and lines that take their value from another line are not considered.
After the work order has been created, check whether every task with a monitoring template code has a line number. If it is missing, add it as described below.
Assign the checklist to the object in the work order
For work orders from a time schedule without object monitoring and for checklists that you insert directly in the work order, you create the link yourself.
- In the work order, open the Work Order Texts page and insert the instruction if it is still missing. See Add a checklist to a time schedule or work order.
- In the first line of the instruction, select the technical object in the Detail No. field.
maintool copies the detail number to all lines of the instruction and enters the Line No. (Object Monitoring Line) if there is exactly one matching object monitoring line for the object. - Check the Line No. (Object Monitoring Line) in every line with a monitoring template code. If it is empty or wrong, open the selection in the field.
The Object Monitoring Line List page shows the object monitoring lines of the object with the matching template. Select the correct line.
The Monitoring Template Code column is hidden on the Work Order Texts page. Show it with Personalize to see which lines need a line number.
Record and post the value
- Enter the measured value in the Result field. See Answer a checklist in the work order.
- Report the work order as finished or close it directly.
Result: For every line with a monitoring template code and a result, maintool posts a performance characteristics ledger entry with the Entry Type Post Value:
- Actual Value is the result,
- Document No. is the number of the work order,
- Posting Date is the date of the finish report,
- Document Date is the date on which the activity was reported finished, otherwise also the date of the finish report.
maintool posts the values directly with the journal template and journal batch from the setup, without placing them in the journal first. You can see the posted values in the performance characteristics ledger entries of the object, see Performance characteristics acquisition and posting (Technical Facility Management).
Every line with a monitoring template code needs a Line No. (Object Monitoring Line) – even if it has no result. If it is missing, the finish report is canceled with an error message about this field. maintool does not post lines without a result. If the reference object of the work order is a mounting position, maintool does not post performance characteristics and does not check the line number.
- If you change the Detail No., maintool determines the Line No. (Object Monitoring Line) again.
- If you change the Task No. of a line, maintool clears Result and Line No. (Object Monitoring Line).
Related articles
- Performance characteristics acquisition and posting (Technical Facility Management)
- Checklists – overview
- Answer a checklist in the work order
- Finish and close a work order
Related to