If a work order contains a checklist, you enter the results in the work order texts during the work and report the activities as finished. Tasks marked as Mandatory must be answered before you can report the work order as finished. This article describes the entry in Business Central and in maintool mobile.
Prerequisites
- A checklist is assigned to the work order. See Add a checklist to a time schedule or work order.
- The work order does not yet have the status Finished. From Finished onwards, the Work Order Texts page can no longer be edited.
Open the work order texts
- On the work order card, choose the Texts action.
- Or choose the Edit action in the Work Order Texts FactBox. The FactBox is hidden on the work order card by default; you can show it with Personalize.
Each instruction starts with the line that contains Type and Code. The lines below belong to this instruction. The Data Type and Range of Values Code columns are hidden; with Personalize you can see which entry a task expects.
Enter results
- Open the work order texts.
- For each checklist task, enter the value in the Result field. You must answer tasks with Mandatory.
- If the task has a range of values, select the value from the list in the Result field.
- Report the activity as finished, see below.
Which entry maintool accepts depends on the data type of the task. The result can hold up to 100 characters.
| Data type | Entry |
| Text | any text |
| Code | text; maintool converts it to upper case |
| Integer, Decimal | whole number or number with decimal places |
| Boolean | yes/no value |
| Date, Time, DateTime | date or time in the Business Central format |
If the entry does not match the data type, Business Central rejects it with an error message.
If you enter a value that does not exist in the range of values of a task, maintool asks: The value … does not exists. Should the value be created? With Yes, maintool creates the value in the range of values; it is then available for all checklist tasks with this range of values. With No, maintool discards the entry.
Report an activity as finished
An instruction in the work order is an activity. You report it as finished in its first line: select the Finished field there. maintool enters Finished at Date-Time and the user ID. In the other lines of the instruction, Finished cannot be set.
To report several activities as finished at once, select the lines, choose the Finished/Not Finished action and answer the question Do you want to finish / not finish the selected line(s)? with Yes. To undo a finish report, clear Finished in the line.
An activity can only be reported as finished if all tasks with Mandatory have a result. Otherwise, Not all mandatory informationss are filled in Instruction No. …. appears. If the first line itself is mandatory and has no result, The current job has not been carried out jet: … appears. Activities whose Detail No. is a mounting position are excluded.
Effect on reporting the work order as finished
When you set the work order to Finished or Closed, maintool checks every instruction in the work order texts. The status change is canceled if
- the first line of an instruction is mandatory and has no result: The field "Result" is missing for job: …,
- an activity is not reported as finished and the Check Work Order Texts Finish toggle is turned on in the Work Order Management Setup on the General FastTab: The current job has not been carried out jet: …,
- an activity is not reported as finished and mandatory tasks have no result: Not all mandatory informations are filled in Instruction No. …. This does not apply if the Detail No. is a mounting position.
If Check Work Order Texts Finish is turned off, it is therefore enough to answer the mandatory tasks. If the toggle is turned on, every instruction must also be reported as finished. maintool posts results of tasks with a Monitoring Template Code as performance characteristics when the work order is reported finished, see Record performance characteristics with a checklist. All checks during the status change are listed in Finish and close a work order.
Checklists in the work order feedback
A work order feedback also contains the open activities of the work order. What is transferred to the work order when the feedback is posted is described in Create and post a work order feedback. The checks when reporting the work order as finished are based on the work order texts of the work order. It is therefore best to enter the results directly in the work order.
Checklists in maintool mobile
In maintool mobile, employees open the checklists of a work order with Checklists on the Work Order page or in the Work Order List. They open the checklist of a single technical object in the Technical Objects list with Checklist.
- The Checklist page shows the entries with text and result. An entry opens the Checklist Entry page.
- There they enter the result according to the data type. For a range of values, they select the value from a list.
- With Previous and Next they switch between the entries.
- If the maintool mobile setup provides for checklist entries to be reported as finished in the app, the app checks the mandatory tasks and reports a mandatory checklist entry without a result.
After synchronization, the results are available in the work order texts of the work order.
Related articles
- Checklists – overview
- Add a checklist to a time schedule or work order
- Finish and close a work order
- Enter comments in the work order
Related to