Enter the location of work

  • Updated

The location of work tells you where the work of a work order takes place: address, contact person on site and coordinates. A work order can have several locations of work; one of them is the main location. You use the locations of work for directions via the online map and in the map view of the schedule board.

In many cases, you do not have to enter the location of work yourself: maintool transfers it from the location of the technical object.

Prerequisites

  • You can only create or delete locations of work while the work order has the status Planning.

Location of work from the location of the object

When you assign a component address, a mounting position or a technical component to a work order and the Locality Code field is filled on the object, maintool automatically creates a location of work. All details of the location are transferred: name, address, company, contact with phone number, mobile phone number and email, and the coordinates. For vehicles, maintool does not transfer a location of work.

This happens

If several objects have the same location, maintool creates it only once. The first location of work of a work order automatically becomes the main location. Follow-up work orders do not take over the locations of work of the original work order.

Enter a location of work manually

  1. Open the work order and choose the Location of Work action.
    The Locations of Work list for the work order opens.
  2. Choose New.
    The Location of Work card opens.
  3. In the Locality Code field, select an existing location if there is one. maintool then fills all fields from the location. Or enter the address yourself: Name, Name 2, Address, Address 2, Post Code, City, Country/Region.
  4. If required, add the contact details (see below).
  5. If required, enter the Latitude and Longitude under Coordinates.
  6. Turn on Main Location if this location of work is the most important one.
  7. Close the card.

Transfer contact details

In the Company No. field, select a contact of the type company, and in the Contact No. field, a person of this company. maintool asks Do you want to transfer the contact informations? each time. With Yes, maintool transfers the address, phone number, mobile phone number and email address from the contact to the location of work. With No, only the name is entered. You can also fill in the Contact Name, Contact Phone No., Contact Cell Phone No. and Contact Email fields manually without a contact.

Main location

  • A work order has exactly one main location. If you mark another location of work as the Main Location, maintool removes the mark from the previous one.
  • If the work order has only one location of work, it always remains the main location.
  • If you delete the main location, another location of work of the work order becomes the main location.
  • On the schedule board, only the main location appears on the map.

Show the location of work on a map

  1. Open the location of work card and choose the Online Map action.
  2. Under Show map with:, choose This address or This coordinates.

The map service opens in the browser. For This coordinates, latitude and longitude must be entered.

Note for partners:
The online map uses the Business Central Online Map Setup. maintool adds the fields MT Map Parameter Setup for Address and MT Map Parameter Setup for Coordinates there, which define which map service is called for addresses and coordinates. If the online map is not set up, the action does not work.

Notes and limitations

  • From the status Execution onwards, you can no longer add or delete locations of work. The message No location can be added if the work order status is "…". or The location cannot be deleted because the work order status is "…". appears.
  • If you change the address of a location of work that was transferred from a location, maintool removes the link to the location: Locality Code and the coordinates are cleared. Enter the coordinates again if required.
  • You can also create and delete locations of work and mark them as the main location on the schedule board, see Use the schedule board.

Related articles

Related to

Was this article helpful?

0 out of 0 found this helpful

Have more questions? Submit a request