A work order request has been recorded, but work planning does not see it in the Current Work Order Requests or Overdue Work Order Requests tiles of their Role Center. Check the following causes in order.
Causes and solutions
| Symptom | Cause | Solution |
| The work order request is in the Work Order Requests list but not in Registered Work Order Requests. | It was not registered, for example because the card was only closed with OK. The tiles count only registered work order requests. | Open the work order request and choose Register. See Record and register a work order request. |
| The work order request is in neither list. | It has already been posted. Posted work order requests are not counted in any tile. | You find it in the Posted Work Order Requests list. If a work order was created during posting, you find it in the Work Orders list. See Create a work order from a work order request. |
| The work order request is in Registered Work Order Requests but in no tile. | Its Entry Date-Time is outside the periods the tiles evaluate. maintool sets Entry Date-Time when the work order request is created, not when it is registered. Work order requests older than the overdue period are no longer counted in any tile. | Process the work order request from the Registered Work Order Requests list. If the tiles should reach further back, extend the Prevoius Period in the Role Center setup (see below). |
| As above, only work order requests of certain departments are missing. | In the Role Center setup, Responsible for Department is filled in. The tiles then count only work order requests whose Res. Department No. matches this filter. Work order requests without a responsible department are missing as well. | Adjust Responsible for Department or clear the field. A registered work order request can no longer be changed, including its department. |
| As above, the tiles show an unexpected period. | maintool calculates the periods from the work date. If a work date other than today is set, the periods shift accordingly. | Check the work date in Business Central. |
Set the period and department of the tiles
The setup applies per user. When a user opens the Role Center for the first time, maintool creates a setup with default values: Actual Period = Week, Prevoius Period = -7D, Actual Period Additional Time = 7D, without a department filter.
- Search for Workplanner Role Center Setups and open the line for your user.
The Maintenance Workplanner Role Center Setup Card page opens. - On the General FastTab, check the following fields:
- Actual Period and Actual Period Additional Time: period of the Current Work Order Requests tile.
- Prevoius Period: length of the period before the actual period that the Overdue Work Order Requests tile counts. Enter a negative date formula, for example -30D.
- Responsible for Department: department filter for the tiles. Blank means all departments.
- Close the card and open the Role Center again.
How maintool calculates the periods in detail is described in Maintenance – Workplanner Role Center.