You want to change, add or delete a planning line on the Lines FastTab of the work order, but the fields cannot be edited or maintool refuses the change. Usually this is due to the status of the work order.
When planning lines can be changed
- Planning: Lines can be changed freely.
- From Execution until before Finished: only if Extended Work Order Planning applies to the work order. maintool then treats new lines and lines with a changed No. as unscheduled lines.
- From Finished: no more changes, not even with Extended Work Order Planning.
maintool takes Extended Work Order Planning from the Work Order Management Setup (General FastTab) when the work order is created. If you change the setup, this only applies to new work orders. See Enter planning lines.
Messages and causes
| Message or symptom | Cause | Solution |
| The fields of the lines cannot be edited, or the message You cannot change the work order line because the work order is already in status … and extended work order planning has not been activated. appears. | The work order is in Execution or a later status before Finished, and Extended Work Order Planning does not apply to it. | Report additional consumption without a planning line. In the work order journal, you can create an unscheduled work order line for this, see Post hours and material in the work order journal. Going back to Planning is only possible if the work order status setup allows it, see Work order status cannot be set back. |
| The fields of the lines cannot be edited, or the message You could not change the work order line because the work order is already in status …. appears. | The work order is Finished or has a higher status. | Reporting and posting are still possible. For further work, create a follow-up work order, see Create a follow-up work order. |
| A line cannot be deleted, and no message appears. | A quantity has already been reported for the line (Reported Quantity greater than 0), or the work order is in Execution or later without Extended Work Order Planning. | The line remains. You correct a quantity posted by mistake via the feedback, see Correct a posted work order feedback. |
| … must not be changed when a quantity is reserved or an error message for the Reserved Qty. (Base) field | Quantities are reserved for the item line. Type, No., Location Code and Variant Code can then not be changed. | Remove the reservation, for example with the Reserve action in the lines, and then change the line. |
| You could not Modify the dimension set, because the work order is still in status …. | From Execution, the dimensions of a line can no longer be changed with the Dimensions action, not even with Extended Work Order Planning. | Define the dimensions in Planning. |
| The Work Order Header … must be smaller than Execution! or an error message for the Blocked field when exploding a bill of materials | Bills of materials can only be exploded while the lines can be changed and the work order is not blocked. | See Enter planning lines. |
| The Work Order Line List page does not allow changes. | The page is read-only. | Change the lines on the Lines FastTab of the work order card. |
Related articles
Related to