Item demand from time schedules and object monitoring

  • Updated

Future maintenance from time schedules and object monitoring creates item demand, even if no work order has been created for the date yet. This way, you see early which material you need and can procure items with long lead times in good time. The demand appears in the item availability by event and is taken into account by Calculate Plan in the Requisition Worksheet and the Planning Worksheet.

Demand from work orders that have already been created is described in Item demand from work orders.

Available from version 20261000.0.

Prerequisites

  • The time schedule contains lines of type Item with a Quantity.
  • The time schedule has a blank Status. For object monitoring, this also applies to the object monitoring line. Blocked, expired and deleted lines do not create any demand.
  • For dates beyond the next date: a Date Preview Period is entered in the Work Order Management Setup (General FastTab), and Create Date Preview is enabled on the time schedule or object monitoring line. See Set up the date preview.

There is no separate setup for the demand. How much is proposed and when depends, as usual, on the planning parameters of the item.

Which dates create demand

  • Next date: The next date (Next Action at Date-Time) counts if New Date possible is enabled. If the work order for the previous date is still open, its demand counts via the work order lines; the demand is not counted twice.
  • Date preview: In addition, every date calculated in advance in the date preview counts.
  • Time schedule without object reference (type Time Schedule): The item lines count for every date of the time schedule.
  • Object monitoring (type Object Monitoring Template): The item lines count for every object monitoring line that uses the time schedule, with the dates of that object.
  • Counter and consumption monitoring: Here, the next date has no fixed date. Demand is created from the date preview, which maintool calculates from the default values of the extrapolation, see Enter default values for the extrapolation. If the work order for the last date is still open, maintool skips the first preview date.

How the demand is determined

  • Date: The demand date is the execution date that a work order for this date would get: the date plus the Execution Day from the Appointments FastTab and, if an Execution Day is entered in the line, plus this day minus one.
  • Quantity: Quantity (Base) of the time schedule line, that is, in the base unit of measure of the item.
  • Location and variant: Location Code and Variant Code of the time schedule line.
  • Planning: As there is no document behind the demand yet, Calculate Plan does not bind the proposed supply firmly to the demand.

Where you see the demand

  • From the time schedule line: On the Lines FastTab of the time schedule, select a line of type Item and choose Line > Item Availability by > Event. The action is only available for lines of type Item.
  • In the item availability by event: Demand from time schedules appears with the type Time Schedule.
  • Requisition Worksheet and Planning Worksheet: After Calculate Plan, they contain proposals for the demand from time schedules.

Notes and limitations

  • As soon as a work order has been created for a date, only its demand counts, see Item demand from work orders.
  • Lines of type External Service, Resource and Resource Group do not create item demand.
  • The further the Date Preview Period reaches, the more future dates create demand.

Note for partners:
Demand from time schedules is taken into account without a switch. After the update to version 20261000.0, the requisition and planning worksheets can therefore contain additional lines. Taking it into account in planning can only be switched off via the OnBeforeIsTimeScheduleDemandToBePlanned event in codeunit GLI Time Sch. Demand Mgt.