Assign objects to a time schedule

  • Updated

A time schedule of type Object Monitoring Template only creates dates once technical objects are assigned to it. The assignment is an object monitoring line with the type of monitoring Date: it links a component address, a mounting position, a technical component or a vehicle to the time schedule and defines the Time Interval and Starting Date-Time for this object. You can assign objects via the time schedule, several at once, or from the technical object.

Prerequisites

Assign objects via the time schedule

This way is suitable if you want to assign several objects to a time schedule.

  1. Open the time schedule and choose the Object Monitoring Lines action.
    The Time Schedule Object Monitoring Lines page opens. It shows all objects that use this time schedule.
  2. In a new line, first select the kind of object in the Type field: Component Address, Mounting Position, Technical Component or Vehicle.
  3. Select the object in the No. field.
    The Object Description column shows the name of the object; maintool takes the Description from the time schedule.
  4. Check Set next Action at (default Finishing).
  5. Enter the Time Interval, for example 6M, and the Starting Date-Time, that is, the point in time from which the calculation starts.
  6. Enter a Due Date Calculation if required.
  7. Check Next Action at Date-Time. This is the first date for this object.
  8. Repeat steps 2 to 7 for all further objects.

Assign a time schedule from the technical object

This way is suitable if you are working on an object and want to assign one or more time schedules to it.

  1. Open the list or card of the object, for example Technical Components, and choose the Monitoring action.
    The Object Monitoring Lines page of the object opens.
  2. Create a new line and select the time schedule in the Time Schedule No. field. Leave the Template Code field blank.
    maintool takes the descriptions from the time schedule. The line has the type of monitoring Date.
  3. Select the line and choose the Card action.
    The Object Monitoring Line - Card page opens.
  4. On the General FastTab, check Set next Action at.
  5. On the Date FastTab, enter the Time Interval and the Starting Date-Time, and if required also Scheduling End Date-Time and Due Date Calculation.
  6. On the Date FastTab, check the Next Action at Date-Time field.

Important fields of the object monitoring line

Field Meaning
Time Schedule No. Time schedule with the activity. It must have the type Object Monitoring Template.
Template Code Remains blank for the type of monitoring Date. A template code links the line to an object monitoring template for counter, threshold or consumption.
Set next Action at From which point in time after a work order the next date is calculated, see Create a time schedule without object reference.
Status Blank = active. Blocked, Deleted and Expired prevent new dates, see Limit, block or phase out a time schedule.
Create Date Preview Whether maintool calculates future dates in advance for this object (default: enabled).
Time Interval Interval between two dates for this object, for example 3M. Must point to the future.
Starting Date-Time Starting point of the calculation. The first date is Starting Date-Time + Time Interval.
Scheduling End Date-Time After this point in time, no more dates are created. Blank = no end.
Due Date Calculation Period after Next Action at Date-Time after which a date counts as overdue in the date proposal. Must be shorter than the Time Interval.
New Date possible, Last Action at Date-Time, Next Action at Date-Time, Calendar Week, Calendar Year Show the status of the date handling for this object (cannot be changed).

Result

maintool calculates separate dates for each assigned object. Due dates appear as date proposals, see Create a work order from a date proposal. An object can have several object monitoring lines, for example for a monthly and an annual maintenance.

Notes and limitations

  • If the selected time schedule has the type Time Schedule, maintool rejects the assignment with an error message on the Type field.
  • For a mounting position, no Template Code can be selected on the card. You monitor mounting positions only with the type of monitoring Date.
  • If you want to use an object monitoring template, select the Template Code first. maintool then takes the Time Schedule No. from the template. If the Time Schedule No. is already filled in, a template code can no longer be entered. How to set up counter and consumption monitoring is described in Set up counter and consumption monitoring with an activity.
  • Scheduling End Date-Time must be later than Starting Date-Time.
  • An object monitoring line with an open work order or with performance characteristics ledger entries cannot be deleted, see Track dates and reinitialize a time schedule.