Not every recurring activity runs indefinitely. With the Scheduling End Date-Time field, you define until when a time schedule or an object monitoring line creates dates. With the Status field, you temporarily stop a time schedule or an object monitoring line, for example while equipment is out of service.
Status at a glance
| Status | Meaning | Exists for |
| (blank) | Active. maintool calculates dates. | Time schedule, object monitoring line |
| Blocked | Stopped manually. | Time schedule, object monitoring line |
| Expired | The Scheduling End Date-Time has been reached. maintool sets this status automatically. | Time schedule, object monitoring line |
| Deleted | Stopped manually, for example if the object is no longer monitored. | Object monitoring line only |
If the status is not blank, the following applies:
- No date proposals appear.
- Create Work Order stops with an error message on the Status field.
- The time schedule or object monitoring line cannot be inserted into a work order as an origin line.
- The item lines do not create any item demand, see Item demand from time schedules and object monitoring.
Existing work orders remain unchanged. You can execute and close them as usual.
Available from version 20260800.0: Status field with the values Blocked and Expired on the time schedule (previously the Blocked toggle), status Expired on the object monitoring line and the Scheduling End Date-Time field.
Limit a time schedule
- Open the time schedule (type Time Schedule) and go to the Interval FastTab. For an object monitoring line, open the Object Monitoring Line - Card and go to the Date FastTab.
- In the Scheduling End Date-Time field, enter until when dates are to be created.
The point in time must be later than Time interval to Start or Starting Date-Time.
maintool no longer creates dates after this point in time, not even in the date preview. If the next date would be later, Next Action at Date-Time remains blank, New Date possible is not enabled and maintool sets the status to Expired.
For object monitoring lines with the type of monitoring Counter, Threshold / Range or Attrition / Consumption, the line counts as expired as soon as the Scheduling End Date-Time is before the work date.
Block a time schedule
- Open the time schedule or the Object Monitoring Line - Card.
- On the General FastTab, select Blocked in the Status field. For an object monitoring line, you can also select Deleted.
In the Time Schedule Object Monitoring Lines and Object Monitoring Lines lists, you can also change the status directly in the Status column.
If you block a time schedule of type Object Monitoring Template, no more date proposals and work orders are created for any of the objects that use it. If you only want to stop a single object, block its object monitoring line.
Reactivate a time schedule
- Blocked or Deleted: Clear the Status field.
- Expired: Move the Scheduling End Date-Time to a later point in time or clear the field. If the next date is then within the scheduling period again, maintool automatically resets the status to blank and calculates the next date.
Blocking does not move the dates. A date that became due while the time schedule was blocked remains. If the activity is instead to start again from a new point in time, restart the cycle with Initialize Time Schedule, see Track dates and reinitialize a time schedule.
Notes and limitations
- A status only affects new dates. To remove a time schedule or an object monitoring line permanently, delete it. This is only possible without open work orders, see Track dates and reinitialize a time schedule.
- The performance characteristics journal no longer offers object monitoring lines with the status Blocked or Deleted for selection.
Related articles
- Appointment management overview
- Track dates and reinitialize a time schedule
- Create a work order from a date proposal
- Time schedule – fields and FastTabs
Related to