Sometimes an urgent malfunction has to be fixed immediately, before a work order exists. To still post the hours and material and to document the work, you record the work order afterwards. This article shows the procedure at a glance and links to the relevant instructions for the individual steps.
Prerequisites
- On the Work Order Management Setup (Numbering FastTab) page, number series are specified for work orders (field Work Order Nos.) and for work order feedbacks (field Work Order Feedback Nos.).
- You know the hours actually worked, the material consumed and any external services.
Record work that has already been completed
- Create the work order. The quickest way is to start from the technical object, for example in the Equipment Information Center or with the Create Work Order action on the object card. The object is then already assigned. See Create a work order from the Equipment Information Center or Create a work order manually.
- On the General FastTab, fill in the description and any other information your company needs for analyses, for example Work Order Category Code and Malfunction Code.
- If the object is still missing, assign it on the Technical Object FastTab. See Assign technical objects to a work order.
- On the Lines FastTab, enter the hours, items and external services actually used with the correct quantities. See Enter planning lines.
- On the Appointments FastTab, enter the time the work was done in the Execution Date-Time field.
- Use the Status Change action to set the work order to Execution. See Schedule a work order and set it to execution.
- Choose the Report as Planned action. maintool posts the lines as they are in the work order. In the same dialog, you can enter the new status in the Work Order Status field right away, for example Finished. See Report a work order as planned.
- If you did not change the status when reporting, report the work order finished. Before doing so, fill in the Activity and Accounting FastTabs as far as your company requires. See Finish and close a work order.
Result
- The hours, items and external services are posted as work order ledger entries.
- maintool created and posted a work order feedback for this. You can find it with the Posted Work Order Feedbacks action on the work order card.
- The work order documents the completed work with the object, description and costs.
Alternative: post a work order feedback without a work order
You can also enter a work order feedback directly and let maintool create the work order when you post it. This is useful if you record the work in a work order feedback anyway.
- Create a new work order feedback.
- In the Work Order No. field, choose the … button. maintool assigns the next number from the number series for work orders. You can only type in your own number if the number series allows manual numbers.
- Enter the description, the technical object and the lines, and post the work order feedback. See Create and post a work order feedback.
When posting, maintool creates the work order with the Type of Origin Work Order Feedback in the Execution status. The lines of the feedback are transferred to the work order as unscheduled lines, as are the objects, texts and comments.
maintool uses the work date as the posting date. If the entries are to be posted with the date of the completed work, change the work date before you use Report as Planned. In a work order feedback that you enter yourself, you can adjust the Posting Date field instead.
Related articles
Related to