In the work order journal, you post hours and material directly to work orders. Each line specifies its own work order, so you can post services for several work orders in one pass. Unlike in the work order feedback, you do not enter comments, activities or checklists here, and the work order status does not change when you post.
Which feedback method fits when is described in Work order feedback – overview.
Prerequisites
- The work order has at least the status Execution and is not blocked.
- The posting setup for the work order is complete. The test report shows you missing entries before posting.
Open the journal
- Search for Work Order Journals.
- If there are several templates, select the appropriate template in Work Order Journal Templates and confirm with OK. If there is only one template, the journal opens directly. If there is none yet, maintool creates one when you open the journal for the first time.
- In the Name field, select the journal batch, for example a separate batch for each department. If the template has no batch yet, maintool creates the batch DEFAULT.
Alternatively, open a specific batch via Work Order Journal Batches with Edit Journal.
Enter lines
- Check the Posting Date and Document No.
In the first line, maintool suggests the work date as the posting date and, if a number series is assigned to the journal batch, the next document no. Without a number series, you enter the document no. yourself; it is mandatory. Each new line takes over the posting date, document no., type and work order no. from the previous line. - In Work Order No., select the work order. The selection shows work orders from status Execution to Finished. Below the lines, you see the work order description.
- Select the Type (Item or Resource) and, in No., the item or resource.
- Enter the Quantity, for resources the hours.
- For items, check the Location Code and Bin Code. maintool suggests the location from the Work Order Management Setup (General FastTab).
- For resources, select a Work Type Code if required.
Show columns such as Location Code, Bin Code, Work Type Code, Unit Cost or Unit Price via personalization.
Assign a planning line: Line No. (Work Order)
With Line No. (Work Order), you assign the posting to a planning line of the work order. maintool helps you with this:
- Enter only the no.: If the work order has exactly one planning line with the same type and the same no., maintool enters its line no. and takes over the description, Execution Date-Time, unit of measure, variant, location, bin, work type code and quantity. If there are no or several such planning lines, the field remains empty. How maintool then distributes the quantity to the planning lines is described in Enter planning lines.
- Select the line no. first: If you select a line from the Work Order Line List in Line No. (Work Order), maintool also takes over the type and no. For planning lines of type Resource Group, maintool takes over nothing; enter the resource yourself.
The quantity taken over is the planned quantity of the planning line. Adjust it to the quantity actually performed. If you change the no. of a line, the work type code is retained unless maintool assigns a planning line with its own work type.
Work type and prices
The Work Type Code only exists for lines of type Resource. maintool does not take the Unit Cost and Unit Price from the planning line but recalculates them via the price calculation as soon as you change the No., Quantity, Work Type Code or Execution Date-Time.
Create unscheduled work order line
If a service does not belong to any planning line, create a line in the work order directly from the journal:
- Select a line in which the Work Order No. is filled in.
- Choose Function > Create unscheduled Work Order Line.
maintool adds an unscheduled line with the description Position (unscheduled) to the work order and reports the new line no. If Line No. (Work Order) in the journal line is still empty, maintool enters the new line there. Unscheduled lines do not count towards the planned costs, see Enter planning lines.
Check and post
- Choose Posting > Test Report. The Work Order Journal - Test report lists warnings for each line, for example Work Order Posting Setup does not exist!, Quantity may not be zero! or The Work Order Status of the Work Order is not postable!. With the Show Accounting and Show G/L Accounting options, you also see the account assignment.
- Resolve the reported issues.
- Choose Post and confirm Do you want to post the journal lines? with Yes.
Or choose Post and Print. maintool then posts and prints the posting report that is specified in the journal template in the Posting Report ID field.
maintool confirms with The journal lines were successfully posted.
Result
- maintool posts work order ledger entries and value entries. You can see them in the journal via Work Order > Entries > Work Order Entries or Value Entries.
- The Reported Quantity of the assigned planning lines increases.
- The work order status remains unchanged. You then finish the work order as usual, see Finish and close a work order.
In the work order journal, you can also correct posted quantities, even for closed work orders. See Correct a posted work order feedback. If Post Time record is switched off in the Work Order Management Setup, posted time recordings also end up as lines in a work order journal, see Record and post times.
Related articles
- Work order feedback – overview
- Create and post a work order feedback
- Enter planning lines
- Correct a posted work order feedback