Create and post a work order feedback

  • Updated

In a work order feedback, you enter which hours and which material were actually used for a work order and post them. Use this way if the effort differs from the plan, if you report in stages, for example daily, or if you want to report activities as finished when reporting.

Prerequisites

  • The work order has at least the status Execution and is not blocked.
  • On the Work Order Management Setup (Numbering FastTab) page, a number series is specified in the Work Order Feedback Nos. field.

Create a work order feedback

  1. Open the work order.
  2. Choose the Create Work Order Feedback action.
  3. If several number series are set up for work order feedbacks, the question Do you want to create a work order feedback? appears. Select a number series in the No. Series field or leave it blank for the default number series, and confirm with Yes.

The Work Order Feedback page opens. Alternatively, create a new feedback in the Work Order Feedbacks list and select the work order in the Work Order No. field. Work orders from Execution to Finished are available for selection.

What maintool takes over from the work order

  • The information that describes the work order and assigns its accounts, for example the description, Reference Object, work order category, Work Order Posting Group, dimensions and budget. You cannot change these fields in the feedback.
  • The assigned technical objects (Details action) and the activities from the work order texts that are still open (Texts action).
  • The Execution Date-Time of the work order. Posting Date and Document Date are set to the work date. You can adjust these three fields.
  • The planning lines only if the Take over Work Order Lines to Feedback Lines automaticly toggle is turned on in the Work Order Management Setup (General FastTab). Otherwise, you transfer them yourself if required (see below).

Edit the lines

In the end, the Lines FastTab contains exactly what this feedback posts to the work order. The types Item and Resource as well as text lines are allowed.

  1. If there are no lines yet and you want to start from the planning lines, choose Functions > Transfer Planning Data.
  2. Adjust the Quantity of each line to the actual effort. Delete lines that were not incurred in this feedback, for example material that has not been consumed yet.
  3. In lines that come from a resource group, enter the resource that did the work in No.
  4. Add new lines for additional effort: Type, No. and Quantity, for items Location Code and Bin Code if required, for resources the Work Type Code if required.

Transfer Planning Data appends all planning lines except external services and sales items to the existing lines. Lines of type Resource Group become lines of type Resource without a number. Use the function only once, otherwise the lines appear twice in the feedback.

Transferred lines are linked to their planning line by the Work Order Line No. When posting, maintool assigns new lines without a work order line number to matching planning lines, see Enter planning lines. maintool does not create new planning lines in the process.

If you change the Execution Date-Time in the header while lines already exist, maintool asks for confirmation. If you choose Yes, maintool moves the execution date of the lines by the same time span.

Copy document

With Copy Document, you take over data from another document. Select the Document Type (Work Order, Work Order Feedback, Closed Work Order, Posted Work Order Feedback or Time Schedule) and the Document No. Use Including Header, Including Lines, Including Details and Including Texts to specify what is copied. With Recalculate Lines, maintool recalculates the line values; with Delete old Lines, it first removes the existing lines.

Report activities as finished

Use the Texts action to open the open activities of the work order. Turn on Finished (or use Finished/Not Finished) and enter the Result if required. When posting, maintool reports these activities as finished in the work order and takes over the result. If you changed the text of an activity, maintool creates it in the work order as a new, finished activity. For more information, see Answer a checklist in the work order.

Post the work order feedback

  1. On the Work Order Feedback page, choose the Post action.
    The question Do you want to report work order consumptions now? appears.
  2. If required, select the status that the work order is to have after posting in the Work Order Status field, for example Finished. If you leave the field blank, the status remains unchanged.
  3. Confirm with Yes.

maintool displays The work order consumption has been posted. You can also post a feedback from the Work Order Feedbacks list with Post.

Result

  • Each line is posted as a work order ledger entry. The Reported Quantity in the planning lines increases.
  • The feedback is no longer listed under Work Order Feedbacks but under Posted Work Order Feedbacks (see below).
  • If you selected a status, the work order has the new status. The same checks ran as for Status Change, see Finish and close a work order.

You can view the posted costs on the work order card via Entries > Ledger Entries or Value Entries and with the Statistics action.

Messages when entering and posting

Message Cause and solution
The Work Order Header … must be at least Execution! The work order is still in Planning. Set it to Execution, see Schedule a work order and set it to execution.
Error message about the Blocked field The work order is blocked. Remove the block in the work order.
There are no work order consumptions to be reported now. The feedback does not contain a line with a number and a quantity. Enter the lines.
You can not assign the current Work Order Feedback Line to work order line …, because there are different dimensions specified. The line is to be assigned to a planning line but has different dimensions. Align the dimensions.
Due to Item Tracking being active, the quantity of the feedback can not exceed the tracked quantity. See Quantity check with item tracking.

Quantity check with item tracking

If item tracking lines (serial or lot numbers) are entered for a planning line in the work order, maintool checks the quantity of the related feedback line. The quantity must not exceed the tracked quantity of the planning line. In this case, check the quantity of the feedback line and the item tracking lines of the planning line.

Posted work order feedbacks

You can find posted feedbacks on the work order card with the Posted Work Order Feedbacks action. They contain the posted lines, details, texts and comments and can no longer be changed. You open unposted feedbacks for the work order with the Work Order Feedbacks action.

You can only close a work order when all work order feedbacks for it are posted. To correct quantities that were posted incorrectly or in excess, proceed as described in Correct a posted work order feedback.