Set up work order management

  • Updated

On the Work Order Management Setup page, you define the basic settings of work order management: defaults for work orders, posting to the general ledger, conflict calculation, purchasing and sales, number series, time recording, checklists and the mobile work order request. This article describes all FastTabs and fields of the page.

Open the Work Order Management Setup

Search for Work Order Management Setup using the search (Alt+Q) and open the page. The page contains the FastTabs General, Conflict Calculation, Purchase, Sales, Numbering, Electronic Signature, Time Recording, Checklist and Mobile Request.

General FastTab

Field Description
Work Order Levels Colored Currently not evaluated in Business Central.
Planned Cost % Colored Currently not evaluated in Business Central.
Exceeding Planned Cost Work Order Specifies which costs the Planned Costs % bar on the work order card compares with the planned costs:
  • Posted Work Order: Invoiced / Planned: the invoiced costs for closed and canceled work orders, the reported costs for all others.
  • Always: Invoiced / Planned: always the invoiced costs.
  • Always: Feedback / Scheduling: always the reported costs.
Date-Time Line Format Currently not evaluated in Business Central.
Work Order Posting Group Work order posting group that maintool enters in new work orders, work order feedbacks and time schedules. If the field is empty, you enter the posting group in the document yourself.
Location Code Location that maintool suggests when you enter an item in a work order line, a work order feedback line or a line in the work order journal. An in-transit location is not allowed. If spare parts are kept at several locations, it is better to leave the field empty.
Date Review Period Date formula that specifies how far back maintool looks when calculating date proposals, for example -1Y. The formula must result in a date in the past.
Date Preview Period Date formula that specifies how far ahead maintool calculates the dates of time schedules (with Create Date Preview) and object monitoring lines, for example 3Y. The formula must result in a date in the future. After a change, maintool asks whether the preview of all dates should be updated now. Empty: no date preview is calculated.
Extended Work Order Planning Default for new work orders. If Extended Work Order Planning is enabled in the work order, you can change and add lines from the status Execution up to before Finished. You can change the setting in the work order itself.
Take over Work Order Lines to Feedback Lines automaticly On: As soon as you enter the work order number in a work order feedback, maintool copies the lines of the work order as feedback lines.
Internal Cost Allocation Controls the dimensions of new lines in work orders, work order feedbacks and the work order journal:
  • On: The line only receives the dimensions of the work order.
  • Off: The line receives the dimensions of the work order, supplemented by the default dimensions of the item or resource and the location.
Stockout Warning On: When you enter an item in a line, maintool checks whether there is enough inventory and warns you about a shortage. On the item card, you can switch the warning on or off differently for each item. Non-inventory items are not checked.
Mandatory of Account / Global Dimension 1 On: When changing to the status Execution, the Account No. or global dimension 1 (for example the cost center) must be filled in for work orders that are not capitalized.
Allow negative Inventory On: Consumption postings, for example from work order feedbacks, may result in negative inventory. Off: maintool stops such a posting with an error message. When you switch the setting on, maintool asks whether you really want to activate it.
Check Work Order Texts Finish On: A work order can only be finished if all activities (work order texts) are reported as finished.
Posting Non-Inventory Item Costs to G/L On: Value entries from the consumption of non-inventory items are posted to the assigned G/L accounts.
Posting Resource Costs to G/L On: Value entries from resource consumption are posted to the assigned G/L accounts. When you change the switch, maintool switches off Accounting Reservation if Capitalized.
Posting Detail Costs to G/L On: Value entries that are assigned to a specific technical object are posted to the assigned G/L accounts.
Accounting Reservation if Capitalized On: For capitalized work orders, maintool additionally posts resource consumption to the resource consumption account and the resource adjustment account of the posting setup.
Automatic Cost Posting On: Value entries are posted to the assigned G/L accounts as soon as a transaction is posted. Off: You post the values yourself at regular intervals, using the Post to G/L action on the work order card or the Post Work Order Cost to G/L report. Costs may need to be adjusted before they are posted to the general ledger.
Bing Key Key for Microsoft Bing Maps. Without a key, the schedule board does not show a map.
Copy Line Descr. to G/L Entry On: The G/L entries receive the description of the work order value entry. Off: maintool builds a description from the entry type and the work order number. The field is only visible via Show more.

When you change Posting Non-Inventory Item Costs to G/L, Posting Resource Costs to G/L, Posting Detail Costs to G/L or Expected Cost Posting to G/L (Purchase FastTab), maintool must update the Post Work Order Value Entry to G/L table for all existing entries. This can take several hours, so maintool asks for confirmation first. When you switch a setting off, the amounts on the interim accounts remain unchanged; you have to carry out any necessary clean-up in the general ledger yourself. Therefore, change these switches during the initial setup if possible.

Conflict Calculation FastTab

Here you specify which availability conflicts maintool calculates and displays for work orders. All four switches are on by default.

Field Description
Calculate Resource Conflict Conflicts in the availability of resources.
Calculate Item Conflict Conflicts in the availability of items. Non-inventory items never cause a conflict.
Calculate External Service Conflict Conflicts for external service lines. As soon as a purchase order exists for the line, maintool no longer shows a conflict.
Calculate Resource Group Conflict Conflicts for resource groups. maintool compares the quantity planned for the resource group with the capacity of the resources assigned to that group.

How conflicts are displayed and how you resolve them is described in Availability conflicts in the work order.

Purchase FastTab

Field Description
Transfer Dimensions to Purchase Line – Work Order Options: blank, Purchase Header or Work Order. With Work Order, maintool copies the dimensions of the entry to the purchase line when a single work order ledger entry is applied to a purchase line. See Apply purchase invoices to work order ledger entries.
Transfer Dimensions to Purchase Line – Capitalized Work Order Options: blank, Purchase Header or Work Order for capitalized work orders.
Posting Invoice to Closed Work Order On: Purchase invoices may be posted to work orders with the status Closed.
Posting Cred. Memo to Closed Work Order On: Purchase credit memos may be entered for work orders with the status Closed.
Create Document if Direct Unit Cost = 0 – Quote, Order Specifies whether maintool creates a purchase quote or purchase order from the work order even if the direct unit cost of a line is 0. If this is not allowed, the message Direct Unit Cost in Line … is 0. appears. See Create a purchase quote or purchase order from a work order.
Expected Cost Posting to G/L On: Value entries from receipt postings are recorded in the general ledger before the invoice. For this, interim accounts must be set up in the posting setup for the relevant posting groups. Expected costs only exist for item transactions. For changing the switch, see the note on the General FastTab.

Sales FastTab

Field Description
Transfer Dimensions to Sales Line – Work Order, Capitalized Work Order Options: blank, Sales Header or Work Order for work orders that are not capitalized or capitalized work orders.
Check Credit Limit On: Before creating a sales quote or sales invoice from the work order, maintool checks the credit limit of the customer. See Create a sales quote or sales invoice from a work order.

Numbering FastTab

In each field, select an existing number series or create a new one.

Field Number series for
Work Order Request Nos. Work order requests
Work Order Nos. Work orders
Work Order Feedback Nos. Work order feedbacks
Transfer of an Work Order Nos. Work order transfers
Budget Sum/Headline Nos. Headlines and total lines in budgets
Budget Nos. Budgets
Budget Position Nos. per Budget Switch. On: Each budget receives its own position number series; the Budget Position Nos. field must then be empty and is locked. You can only switch it off as long as no budget has its own position number series.
Budget Position Nos. Budget positions (if Budget Position Nos. per Budget is off)
Work Plan Nos. Work plans
Time Schedule Nos. Time schedules

How to number budgets is described in Create and structure a budget.

Electronic Signature FastTab

In the Work Order Request Registering / Posting group, the Dual Control switch specifies that a work order request must not be posted by the same person who registered it. See Review and post a work order request.

Time Recording FastTab

Field Description
Time Recording Journal Templ. Template of the work order journal used by time recording.
Time Recording Journal Batch Journal batch within this template.
Time Record Nos. Number series for time recordings.
Post Time record On: maintool posts the time recording directly. Off: maintool transfers the times as lines to the journal specified above; you post them there.

See Record and post times.

Checklist FastTab

Field Description
Checklist Task Nos. Number series for tasks in the checklist catalog.
Checklist Perf. Jnl. Templ. Template of the performance characteristics journal through which maintool posts performance characteristics from checklist tasks.
Checklist Perf. Jnl. Batch Journal batch within this template.

See Record performance characteristics with a checklist.

Mobile Request FastTab

In the Default Reference Object field, you select the reference object that maintool fills in when a new work order request is created in the mobile view (Mobile Light User Role Center): Component Address, Mounting Position, Technical Component or Vehicle. If the field is empty, nothing is filled in.

Work order status

Using the Functions > Change Work Order Status action, you open the Work Order Status Setup page. There you specify how status changes work and who receives an email when the status changes. See Set up work order statuses.

Further setup steps

You maintain further master data of work order management on the pages Types of Activity, Malfunction Codes, Work Order Priorities, Shifts, Work Order Journal Templates and Date Proposal Names. You can find all pages using the search (Alt+Q).