Start the history of technical components

  • Updated

As long as a technical component has the Assignment Installation, it is in the master data phase: You can change its installation location and spare part data directly on the card. Starting the history begins the installation and removal history. From then on, maintool documents every change of the installation location as a posting. You typically start the history once the equipment structure has been fully built and work with maintool begins.

Prerequisites

  • The component has the Assignment Installation and is not blocked.
  • The installation location and component place are entered on the card as the component is actually installed.
  • So that the entries from Start History receive a document number, the Document Nos TC-Attachment field is filled in the Technical Facility Management Setup (Numbering FastTab), see Set up technical facility management.

Assignment of a technical component

Assignment Meaning
Installation No history, no technical components ledger entries. Installation location, component place and spare part data can be changed on the card.
Bound The component is installed (in a component, a mounting position or a vehicle).
Unbound The history is running, but the component is currently not installed – for example after removal.

Start the history of one component

  1. Open the Technical Component Card or select the component in the Technical Components list or in the Equipment Information Center.
  2. Choose the Start History action.
  3. Confirm the question Do you want to start the history of …? with Yes.

Result: maintool posts a Start entry. If an installation location is entered on the card, maintool also posts a Connect entry with this installation location and reports The … was successfully bound. The Assignment is then Bound, without an installation location Unbound. The posting date is the work date.

Start the history of many components at once

After building the equipment structure, the easiest way to start the history of all components is via the component journal.

  1. Search for Technical Component Journals and select the Batch Name if required.
  2. Choose the Import of Technical Components action.
    The Import Technical Components into Journal report opens.
  3. Leave Default Entry Type set to Connect.
  4. If required, limit the components with filters, for example by No. or Mounting Position No.
  5. Choose OK.
    maintool creates a line with the entry type Connect and the installation location from the card for each component with the Assignment Installation.
  6. Check the lines with Test Report and choose Post.

Result: For each line, maintool posts the start and – if an installation location is entered – the installation. Components without an installation location receive the Assignment Unbound.

With the Default Entry Type Disconnect, the report instead imports all components with the Assignment Bound, for example to remove many components at once. The report never imports components with the Assignment Unbound.

Notes and limitations

  • After the start, Component from, Component Place, Mounting Position No. and Component from Vehicle No. can no longer be changed on the card. The message Assignment has to be Installation for Tech. Component …. appears. Then change the installation location by posting, see Install, remove and relocate a technical component.
  • The fields on the Spare Part FastTab can no longer be edited afterwards either, see Bill of materials and spare parts of a technical component.
  • If the component already has a history, Start History reports The Assignment from … must have Installation!
  • When starting, the rules for component places from the setup apply (Bind Component Place, 1 by 1), see Technical component place.

Related articles

Related to

Was this article helpful?

0 out of 0 found this helpful

Have more questions? Submit a request