With appointment management, you plan recurring activities such as maintenance, inspections and tests. You describe the activity once in a time schedule and define the interval at which it becomes due. maintool calculates the dates from it, shows due dates as date proposals and transfers the information from the time schedule to the work order. Once the work order is done, maintool calculates the next date.
Time schedule and object monitoring line
The time schedule is the document of the recurring activity. In it, you define what has to be done (description, type of activity, lines with items, resources and external services, texts with instructions, notes and checklists) and which defaults the work order receives, for example person in charge, responsible department and account assignment. In the Type field, you choose what the time schedule is used for:
- Time Schedule: activity without reference to a technical object, for example the regular check of driving licenses. The interval is defined in the time schedule itself.
- Object Monitoring Template: activity on technical objects, for example the inspection of a pressure vessel or of all power tools in a hall. You define the interval per object.
The object monitoring line links a technical object (component address, mounting position, technical component or vehicle) to a time schedule of the type Object Monitoring Template. This way, you can assign any number of objects to one activity, each with its own interval. The Type of Monitoring of the line determines what makes a date due:
- Date: by time, for example every six months.
- Counter: by a counter reading, for example every 500 operating hours.
- Threshold / Range: when a measured value is outside the defined thresholds.
- Attrition / Consumption: when a stock or wear value decreases, for example the content of a tank.
For Counter, Threshold / Range and Attrition / Consumption, you record performance characteristics for the object. Date proposals are then created from the posted values.
From the time schedule to the next date
- You create a time schedule and assign the objects if required. From the starting point and the Time Interval, maintool calculates the first date (Next Action at Date-Time).
- Due dates appear as date proposals: in the work planning Role Center in the Date Proposal List and on the Date Proposal Worksheet page, where you choose the period and filters yourself.
- You create work orders from one or more date proposals. maintool transfers the information from the time schedule and sets New Date possible on the time schedule or object monitoring line to No (except for Fixed Date).
- Once the work order has reached the stage defined in the Set next Action at field (default: Finishing), maintool calculates the next date from this point in time. With Fixed Date, the dates follow a fixed rhythm, independently of the work order.
maintool logs every date in the date handling. You open the Date Handlings page on the time schedule or object monitoring line with the Handlings action.
Important terms
| Term | Meaning |
| Date proposal | Due or overdue date of a time schedule or object monitoring line from which you create a work order. |
| Date Proposal Name | Saved setting that maintool uses to calculate date proposals: which sources and which filters apply. |
| Date Preview | Expected further dates after the next date, for example for annual planning. Preview dates do not create work orders. |
| Set next Action at | Defines the work order event from which the next date is calculated: Opening, Execution, Finishing, Completing or Fixed Date. |
| New Date possible | Shows whether a date proposal and a work order can be created from the current date. |
| Date handling | Log of all dates of a time schedule or object monitoring line with the related work orders. |
Setup
Time schedules
- Create a time schedule without object reference
- Create a time schedule with object reference
- Assign objects to a time schedule
- Time schedule – fields and FastTabs
- Limit, block or phase out a time schedule
- Track dates and reinitialize a time schedule
- Create a work order directly from a time schedule or object monitoring line
- Update prices in time schedules
- Item demand from time schedules and object monitoring
Date proposals
Object monitoring
- Set up counter and consumption monitoring with an activity
- Set up threshold monitoring with an activity
- Enter default values for the extrapolation
- Dependencies between object monitoring lines
Troubleshooting
- No date proposal appears
- No new date: "New Date possible" is off
- A time schedule or object monitoring line cannot be deleted
Related articles
- Performance characteristics – overview
- Add a checklist to a time schedule or work order
- Maintenance – Workplanner Role Center
Related to