Before you create component addresses, mounting positions, technical components and vehicles, it is worth planning the equipment structure. This article shows which decisions you should make in advance – views, numbers, role of the mounting positions, level of detail – and in which order you build the structure in maintool.
Building blocks of the equipment structure
- Component address group – a view of your equipment, for example "Plant North" (spatial) or "Utility systems" (technical). Each group forms its own tree structure. With several groups, you map parallel structures.
- Component address – the levels of the structure, for example plant, plant section, assembly. You arrange them below each other with the Component Address from field, up to 8 levels deep.
- Mounting position – the place where technical components are installed or vehicles are parked. A mounting position is assigned to exactly one component address per component address group. Because it can belong to several groups, it connects the parallel structures.
- Technical component – the part to be maintained. It sits in a mounting position, below another technical component (up to 8 levels) or in a vehicle.
- Vehicle – is assigned to a mounting position with the Actual Location field and can contain technical components itself.
How the objects are related is described in Technical facility management overview.
Prepare the structure
Define the setup before you start recording. Helpful are, for example:
- sketches of the equipment and its parts,
- a visualization, for example with Microsoft Visio or as a folder structure in File Explorer,
- a table in Microsoft Excel with all objects, their numbers and the respective parent object.
Clarify which views (component address groups) you need. One group can be Cost Relevant. maintool takes the dimensions for work orders on mounting positions that have no default dimensions themselves from this group. You set up the groups as described in Set up master data for technical facility management.
Numbers and coding
- Each object needs a unique No. with a maximum of 20 characters.
- You specify the number series per object type in the Technical Facility Management Setup (Numbering FastTab): Component Adress Nos., Mounting Position Nos., Technical Component Nos., Vehicle Nos.
- If you want to assign numbers manually according to your own coding ("speaking" numbers), the number series must allow Manual Nos.
- Enter longer codes, or codes that occur several times, in the Search Description field (up to 100 characters) and let maintool assign the No. automatically. maintool first fills in the Search Description with the description; you can change it afterwards.
The following split has proven useful, for example:
| Object | Number assignment |
| Component address | manual, according to coding |
| Mounting position | manual, according to coding |
| Technical component | automatic |
| Vehicle | automatic |
Mounting position as installation location or as structure level
With parallel structures: mounting position as installation location
If you plan several views, the mounting position should represent the installation location of one or more technical components. It can then be placed at the right point in each group.
| Example | Object in maintool |
| Plant site | Component address group |
| Plant | Component address |
| Plant section | Component address |
| Assembly | Component address |
| Location of the part | Mounting position |
| Part | Technical component |
Without parallel structures: mounting position as structure level
If you only need one view, the mounting position itself can be a level of the structure, for example the assembly.
| Example | Object in maintool |
| Plant site | Component address group |
| Plant | Component address |
| Plant section | Component address |
| Assembly | Mounting position |
| Part | Technical component |
Define the level of detail
An equipment structure is often planned in too much detail. Check for each level:
- Can your users keep the master data up to date to this extent in the long run?
- Is the object worth maintaining or just a wear part? Only record technical components down to the part that is still maintained. List wear material such as bearings or seals as items in the bill of materials of the technical component, see Bill of materials and spare parts of a technical component.
- Does the structure remain clear?
Also keep in mind:
- You can record work orders and work order requests for all four object types.
- You record performance characteristics such as counter readings or operating hours only for component addresses, technical components and vehicles, not for mounting positions (see Performance characteristics – overview).
Order of setup
- Specify the number series and settings in the Set up technical facility management.
- Create the component address groups; if required, mark one of them as Cost Relevant.
- Create the component addresses of the top level with a Component Address Group, and below them the further levels with Component Address from (Create a component address).
- Create mounting positions and assign them to the component addresses (Create a mounting position and assign it to a component address).
- Create and install technical components (Create a technical component), then start their history (Start the history of technical components).
- Create vehicles and assign them to a mounting position (Create a vehicle).
- Assign data sheet templates and, if required, create object monitoring lines for performance characteristics.
You create similar objects faster by copying an existing object, see Duplicate technical objects.
Check the structure
Check the setup in the Equipment Information Center while you are still recording. You open it from the card of each object with the Equipment Structure action. The action is only available if the object is part of a structure with a Component Address Group. How to use it is described in Use the Equipment Information Center.
You create location addresses (for example buildings or properties) separately and pass them on down the structure, see Locations of technical objects.
Related articles
- Technical facility management overview
- Set up master data for technical facility management
- Create a component address
- Use the Equipment Information Center
Related to